NEPAL · RESEARCH WORKING EDITION

Law. Evidence.
Open questions.

A Nepal legal baseline and comparison matrix for data-center policy. Start with existing authority. Identify what we know. Make the next question precise.

Initial baseline
not a legal clearance

Selected directive and water-law provisions have been examined, including the Valley Board’s 2082 regulations. KVWSMB’s groundwater permit role is text-supported; later changes, site boundaries and project conditions still require confirmation. No Nepal record in this edition is labeled current consolidated law verified. A missing rule in the matrix means a research gap—not that no law applies.

Keep the distinctions visible.

Download full research JSON ↓
Partial baseline

Selected legal text or an indexed official excerpt supports a limited starting point. Currency and applicability checks are still required.

Open baseline

A legal topic is identified, but the operative Nepal rule or its application has not yet been established.

Comparison / policy option

A foreign mechanism is an example. A possible Nepal option is a research proposal, not an existing Nepal obligation.

Nepal baseline & comparison matrix

Read across: existing evidence → unresolved question → comparative mechanism → possible policy response.

Download matrix CSV ↓

Showing 10 of 10 issues. Sources reviewed or attempted on 2026-11-03; see each source’s evidence status.

Nepal legal baseline, verification questions and comparative policy options
Issue & Nepal baselineWhat must be verifiedComparative mechanismPossible Nepal option
N01

Entry, registration & service scope

Partial baseline

Reviewed Nepali clauses require pre-service listing, separate listings for data-center and cloud services, and annual Poush-end updates (NP11). A separate official notice links application formats (NP15).

NP11 ↘NP15 ↘NP01 ↘NP02 ↘NP07 ↘
Verification question

Confirm the signed approval date, current office, forms, covered actors and amendments. Reconcile existing-operator transition and certification provisions before assigning a deadline.

High research priority

No comparison selected yet. Establish the Nepal baseline before choosing a model.

Proposal for evaluation

Build an approvals map distinguishing facility owner, colocation operator, cloud provider and tenant.

Transferability & limits

Listing is one approval layer. It does not establish water, environmental or municipal clearance. Clause 6(3)’s government-data Tier III requirement is not a blanket tier rule for every facility.

N02

Water allocation & groundwater

Partial baseline

KVWSMB is the text-supported groundwater permit authority for its Valley jurisdiction (NP16). Under the 2082 rules, deep-boring users apply to the Board; Schedule 3 addresses its Executive Director. Drilling providers and tanker/jar/bottling services have separate permits (NP14). General national priorities remain relevant background (NP04).

NP14 ↘NP16 ↘NP18 ↘NP04 ↘NP12 ↘NP17 ↘NP13 ↘
Verification question

Confirm parcel jurisdiction, current restrictions/fees, use and well category. The domestic/religious-use exemptions do not establish an industrial-cooling exemption. Identify the authorized signatory and reconcile later directives. For purchased water, verify supplier and source permits.

High research priority
Proposal for evaluation

Evaluate source-specific water budgets, drought stages, metering, aquifer testing and enforceable restrictions on consumptive cooling.

Transferability & limits

For a project borewell, start with KVWSMB rather than treating KUKL’s supply contract or a municipal recommendation as abstraction permission. This is an authority map, not clearance. The older national committee process must not be substituted automatically for the Valley route.

N03

Electricity, grid upgrades & exit risk

Open baseline

Electricity-law and NEA sources are identified; no current data-center-specific tariff, guaranteed supply entitlement or cost-allocation rule has been verified.

NP08 ↘NP10 ↘
Verification question

Who pays for connection and upstream upgrades, unused reserved capacity, curtailment and early exit? What is available in the dry season?

High research priority
Minnesota Statutes § 216B.1622 — service to very large customers

The commission must define very-large-customer classes by December 15, 2026. Tariff/agreement review considers attributable costs, clean-energy benchmarks and protection of other customers against stranded costs.

Text reviewed; implementation pending · Subdivisions 1–2
Oregon HB 3546 (2025), enrolled text

Covered electricity-service contracts must last at least ten years and provide commission-determined minimum payments tied to projected use.

Text reviewed; implementation check needed · Section 3(1)(b)(A)(ii)–(iv), enrolled pp. 1–2
Proposal for evaluation

Assess study deposits, collateral, staged load commitments, minimum bills and exit-cost guarantees.

Transferability & limits

Test utility/regulator authority, foreign-exchange risks, enforceability and demand uncertainty before recommending any contract term.

N04

Environmental review & cumulative effects

Open baseline

A government index lists the environmental Act and Regulation. The exact assessment category and approving body for a data center and associated works remain unverified.

NP05 ↘
Verification question

Which current schedule entries trigger review for buildings, water works, generators, substations or transmission lines? Are cumulative projects and expansions assessed?

High research priority
Fairfax County adopted data-center zoning amendment

The adopted amendment addresses operating-equipment enclosure and noise studies before site-plan approval and occupancy, with exceptions and transition provisions.

Adopted text reviewed; current codification pending · § 4102.6.A(1), (6) and transition provisions; PDF pp. 3–5
Proposal for evaluation

Consider coordinated review of the facility and associated infrastructure, alternatives and cumulative impacts.

Transferability & limits

Do not assert every data center requires a full EIA. Establish the actual statutory trigger and institutional jurisdiction.

N05

Siting, noise, air & local approvals

Open baseline

The local-government Act is identified. Applicable municipality-specific siting, noise, fire and emissions standards are not yet established.

NP09 ↘NP05 ↘
Verification question

Which municipality/province has approval and enforcement powers? Which rules cover cooling equipment, diesel generators, fuel storage and sensitive neighbors?

High research priority
Fairfax County adopted data-center zoning amendment

The adopted amendment addresses operating-equipment enclosure and noise studies before site-plan approval and occupancy, with exceptions and transition provisions.

Adopted text reviewed; current codification pending · § 4102.6.A(1), (6) and transition provisions; PDF pp. 3–5
Proposal for evaluation

Evaluate preconstruction and operating noise studies, setbacks, equipment mitigation and public permit conditions.

Transferability & limits

Account for low-frequency sound and site conditions, but verify the measurement standard and legal power before proposing numerical limits.

N06

Foreign investment & contractual structure

Partial baseline

Selected provisions of a government-hosted 2019 English FITTA text were reviewed. Current amendment, notification and sector-classification checks remain open.

NP03 ↘
Verification question

What current approvals and restrictions apply to ownership, technology transfer, financing and repatriation? Does a PPP or government agreement alter the approval path?

High research priority

No comparison selected yet. Establish the Nepal baseline before choosing a model.

Proposal for evaluation

Prepare separate approval maps for private FDI, PPP and government arrangements; disclose ownership and contingent public liabilities.

Transferability & limits

Do not assume an investment agreement overrides general environmental, water, privacy or municipal law. Obtain current Nepali texts and project documents.

N07

Privacy, cybersecurity & cross-border data

Open baseline

Official Privacy Act and Electronic Transactions Act sources, plus the directive, are identified. Their operative obligations and interactions are not yet fully reviewed.

NP01 ↘NP06 ↘NP07 ↘
Verification question

Who controls data, who may access it, what sector-specific hosting or transfer duties apply, and who handles incidents and service continuity?

High research priority

No comparison selected yet. Establish the Nepal baseline before choosing a model.

Proposal for evaluation

Map data categories and responsible entities; evaluate audit, access controls, incident reporting, portability and continuity obligations.

Transferability & limits

A physical facility’s location does not by itself settle jurisdiction, ownership of data, or lawful government access. Do not assert a general localization mandate.

N08

Public finance, jobs & local benefits

Open baseline

The investment text provides an entry point. Current tax incentives, budget measures and any data-center-specific benefit conditions have not been verified.

NP03 ↘
Verification question

What exemptions, subsidies, public works or guarantees apply, and what independently supported jobs and tax benefits remain after those costs?

Medium research priority

No comparison selected yet. Establish the Nepal baseline before choosing a model.

Proposal for evaluation

Test incentives against measurable employment, procurement, tax and infrastructure outcomes; assess disclosure and recapture options.

Transferability & limits

Separate temporary construction jobs from permanent operations. Compare net public benefit with feasible alternatives; no job multiplier is assumed.

N09

Transparency & public participation

Partial baseline

The general Water Resources Rules provide a 35-day adverse-impact response route (NP12). The older Valley directive describes local hearings (NP17), but its current status is unresolved after replacement of the 2064 rules. Do not assume the same procedure applies to every Valley permit.

NP12 ↘NP14 ↘NP17 ↘NP05 ↘NP09 ↘
Verification question

Obtain current Valley hearing/notice instructions and the later groundwater directive; establish how these interact with environmental review and local consultation. Preserve the distinction between the national water route and special Valley permits.

High research priority
Fairfax County adopted data-center zoning amendment

The adopted amendment addresses operating-equipment enclosure and noise studies before site-plan approval and occupancy, with exceptions and transition provisions.

Adopted text reviewed; current codification pending · § 4102.6.A(1), (6) and transition provisions; PDF pp. 3–5
Proposal for evaluation

Assess public project registers and consistent energy/water reporting, with narrowly justified security and confidentiality limits.

Transferability & limits

EU reporting is a comparison lead. Identify Nepal’s existing disclosure duties and agency resources before adding reporting layers.

N10

Enforcement, closure & ownership changes

Open baseline

No data-center-specific decommissioning security, successor-liability or long-term restoration requirement has been established in this baseline. That is a research gap, not evidence of absence.

NP01 ↘NP03 ↘NP05 ↘
Verification question

Which general laws and permits address closure, equipment/waste disposal, groundwater harm, abandoned grid assets and transfer of ownership?

High research priority
Minnesota Statutes § 216B.1622 — service to very large customers

The commission must define very-large-customer classes by December 15, 2026. Tariff/agreement review considers attributable costs, clean-energy benchmarks and protection of other customers against stranded costs.

Text reviewed; implementation pending · Subdivisions 1–2
Oregon HB 3546 (2025), enrolled text

Covered electricity-service contracts must last at least ten years and provide commission-determined minimum payments tied to projected use.

Text reviewed; implementation check needed · Section 3(1)(b)(A)(ii)–(iv), enrolled pp. 1–2
Proposal for evaluation

Evaluate closure plans, financial security, transferable permit duties and asset-specific exit obligations.

Transferability & limits

Distinguish utility stranded costs from land restoration and waste liability. Each may require a different authority, beneficiary and enforcement route.

The source notebook

Every record states what was examined, where to look and what remains unresolved.

23 records · checked / attempted 2026-11-03

“Official source lead” and “indexed excerpt only” are not full-text verification. “Text reviewed” does not establish current consolidated law. Download failures are recorded rather than filled with inferred provisions.

NP01Official publication metadata reviewed

Nepal government publication

Data Center and Cloud Service (Operation and Management) Directives, 2081 — ministry publication

The ministry identifies the 2081 directive. Its webpage date is publication metadata, not proof of commencement or the latest consolidated version.

Pinpoint / scope: Ministry publication page; Nepali text examined separately at NP11

Still to verify

Compare the publication attachment with NP11; check later amendments and implementation instruments. Do not substitute webpage upload dates for legal commencement.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP02Indexed excerpt only

Government-hosted translation

Data-center directive — government-hosted unofficial English translation

The indexed unofficial translation invokes Electronic Transactions Act section 79 and commencement on approval. Its reported January 28, 2025 approval date is not independently confirmed here.

Pinpoint / scope: Preamble and clauses 1–2, indexed excerpt

Still to verify

Full English PDF retrieval timed out. Signed Nepali scan NP11 appears to show 2081/10/15; reconcile the calendar conversion and any later instruments before calculating a transition deadline.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP03Text reviewed; currency pending

Government-hosted English legal text

Foreign Investment and Technology Transfer Act, 2019 (2075)

The reviewed English text permits foreign investment subject to exclusions and approval requirements. It addresses technology-transfer agreements and investment applications; sections 10–11 have notification-dependent commencement.

Pinpoint / scope: Sections 1(2), 3–4, 7 and 15; PDF pp. 1, 3–4, 6

Still to verify

Check current amended Nepali Act, gazette notifications, rules, sector classification, thresholds and approving body. Do not treat this older English PDF as a current consolidated statement.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP04Selected text reviewed; currency pending

Primary legal text reproduced in FAO legal repository

Water Resources Act, 2049 (1992) — English text in FAOLEX

The English text includes groundwater, vests ownership in Nepal, requires a license subject to listed exemptions, and prohibits harm to others. Section 8 requires economic, technical and environmental material for utilization applications.

Pinpoint / scope: Sections 2(a), 3–4, 7–8; PDF pp. 1–5

Still to verify

Government-hosted copy timed out; FAOLEX supplies readable legislation, not a current consolidation guarantee. Verify Nepali amendments, commencement notice, prescribed land-confined-water exemption and later special regimes. Land ownership alone does not establish an exemption.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP05Official index reviewed

Government legal index

Environment Protection Act 2076 and Regulation 2077 — government index

The department’s index lists the Environment Protection Act 2076 and Environment Protection Regulation 2077. The index establishes source availability, not a data-center-specific assessment trigger.

Pinpoint / scope: Index items 10 and 12

Still to verify

Retrieve current Act, amended regulations and schedules. Determine BES/IEE/EIA triggers for the actual facility, associated power/water works and location; verify hearing and cumulative-impact requirements.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP06Official source lead

Official legal publication

Privacy Act, 2075 — Nepal Law Commission

A Law Commission publication identifies the Privacy Act. No substantive privacy, localization, transfer or access rule is verified by this record.

Pinpoint / scope: Title-level discovery; provisions not reviewed

Still to verify

Review current Nepali text and rules, sector-specific duties, lawful-access powers, cross-border transfers and controller/provider responsibilities. Do not infer blanket localization from the title.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP07Official source lead

Official legal publication

Electronic Transactions Act, 2063 — Nepal Law Commission

The Law Commission indexes the Electronic Transactions Act. The directive translation cites it as enabling authority.

Pinpoint / scope: Act title; section 79 referenced by NP02

Still to verify

Retrieve amended Act, verify section 79 delegation and interplay with newer enactments or pending bills. A bill is not an operative replacement without enactment and commencement checks.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP08Official source lead

Official legal index

Electricity Act 2049 / Electricity Rules 2050 — Department of Electricity Development

The department indexes the Electricity Act and Rules. No data-center tariff or interconnection entitlement is established in this review.

Pinpoint / scope: Electricity Act and Rules index

Still to verify

Review current electricity and regulator legislation, NEA tariff orders, connection rules, large-load contracts and self-generation requirements; confirm which body can impose cost and curtailment conditions.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP09Official index reviewed

Official legal publication

Local Government Operation Act, 2074 — government publication

A government publication page identifies the Act. Site-specific municipal and provincial approvals remain unestablished.

Pinpoint / scope: Publication page; operative text not reviewed

Still to verify

Map constitutional allocation of powers, current Act and relevant municipality’s land-use, building, fire, noise, groundwater and waste rules. Obtain actual permits for a case-study site.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP10Official index reviewed

Official empirical source

Nepal Electricity Authority — annual reports

NEA provides annual reports for electricity-system research. No numerical conclusion about spare capacity, reliability or project load is made here.

Pinpoint / scope: Annual-report index; datasets not extracted

Still to verify

Extract monthly generation/import/export, dry-season supply, peak load, regional network constraints and tariffs from the latest report; document units and reporting period.

Open source ↗

Review / retrieval attempt: 2026-11-03

US01Text reviewed; implementation pending

Comparative controlling text

Minnesota Statutes § 216B.1622 — service to very large customers

The commission must define very-large-customer classes by December 15, 2026. Tariff/agreement review considers attributable costs, clean-energy benchmarks and protection of other customers against stranded costs.

Pinpoint / scope: Subdivisions 1–2

Still to verify

Check subdivision 3 exemptions and utility-specific orders before applying the model to a particular Minnesota facility. Nepal transferability requires a separate authority and capacity assessment.

Open source ↗

Review / retrieval attempt: 2026-11-03

US02Text reviewed

Comparative controlling text

Minnesota Statutes § 103G.271, subdivision 5b — water permit conditions

Covered data-center water permits above the stated 100-million-gallon annual threshold address public welfare, conservation and water-use conflicts. An aquifer test is required when the commissioner finds it necessary for protection.

Pinpoint / scope: Subdivision 5b(a)–(b)

Still to verify

Check definitions and full applicability. This threshold belongs to Minnesota; it is not a proposed Nepal threshold or a guarantee of adequate water protection.

Open source ↗

Review / retrieval attempt: 2026-11-03

US03Text reviewed; implementation check needed

Comparative legislative text

Oregon HB 3546 (2025), enrolled text

Covered electricity-service contracts must last at least ten years and provide commission-determined minimum payments tied to projected use.

Pinpoint / scope: Section 3(1)(b)(A)(ii)–(iv), enrolled pp. 1–2

Still to verify

Check enacted/codified text, definitions, utility orders, tariff implementation and litigation before treating an individual contract as controlled by this text. Do not transplant a ten-year term without Nepal-specific analysis.

Open source ↗

Review / retrieval attempt: 2026-11-03

US04Adopted text reviewed; current codification pending

Comparative adopted ordinance

Fairfax County adopted data-center zoning amendment

The adopted amendment addresses operating-equipment enclosure and noise studies before site-plan approval and occupancy, with exceptions and transition provisions.

Pinpoint / scope: § 4102.6.A(1), (6) and transition provisions; PDF pp. 3–5

Still to verify

Check current clean codification and later amendments; distinguish zoning noise studies from the separate noise ordinance. These are county-specific rules.

Open source ↗

Review / retrieval attempt: 2026-11-03

EU01Official summary reviewed

Official explanatory summary

European Commission — sustainability reporting scheme

The Commission describes recurring data-center sustainability reporting and indicators concerning energy, water, renewable energy and waste heat.

Pinpoint / scope: March 15, 2024 announcement

Still to verify

EUR-Lex retrieval met a verification screen. Review Regulation (EU) 2024/1364 and Directive (EU) 2023/1791 for current scope, thresholds, confidentiality and amendments; this summary is not controlling text.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP11Selected Nepali clauses visually checked

Government-hosted Nepali legal text

Data Center and Cloud Service Directive, 2081 — Nepali government-hosted copy

Clause 3 requires listing before service and separate listings for the two services. Clause 4 requires details updated by Poush-end annually. Clause 6(3) sets Tier III or higher for providers storing government data.

Pinpoint / scope: Clauses 3(1), 3(13), 4 and 6(3); signed scan PDF pp. 2, 4–5; approval line p. 1

Still to verify

PDF downloaded; selected clauses checked against page images because indexed OCR garbles numbering and dates. Approval line appears to read 2081/10/15; obtain Nepali-law/date reconciliation before using a transition deadline. Annex, amendments, current office and implementation remain unchecked.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP12Selected text reviewed; currency pending

Primary legal text reproduced in FAO legal repository

Water Resources Rules, 2050 (1993) — Law Commission English text in FAOLEX

The reproduced rules assign licensing to a District Water Resources Committee. Rule 17 requests project and environmental information; rule 19 provides public notice, 35 days for reasoned adverse-impact reactions, and license conditions addressing reactions. Rule 22 confines use to the licensed works, place and area.

Pinpoint / scope: Rules 8, 17–20 and 22; PDF pp. 3, 6–9

Still to verify

Verify current Nepali rules and post-federal institutional succession. This older structure does not settle today’s competent office, a special Valley route, or a project’s separate environmental-assessment obligations.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP13Official plan text reviewed

Official administrative practice / plan

Kathmandu Valley Water Supply Management Board — action plan

The Board describes licensing groundwater users, including shallow commercial users, and monitoring licensed wells. It also seeks legal and policy clarity under the federal structure.

Pinpoint / scope: Short-term groundwater licensing items; mid-term legal/policy clarity item

Still to verify

Undated planning evidence only. Its shallow-commercial licensing aspiration does not settle current entitlement: assess NP14 rules 2, 10, 15–16 and site restrictions. Confirm the notified Board boundary and current intake requirements.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP14Selected operative rules visually checked

Official Board-hosted Nepali rules

Kathmandu Valley Water Supply Management Board Rules, 2082 — Board-hosted signed scan

Rule 10 provides Board-issued deep-boring permits; Schedule 3 addresses the Executive Director. Rule 11 separately licenses drilling providers; rule 13 covers tanker/jar/bottling services. Rule 14 sets three-year terms and renewal applications 30 days before expiry. Rule 40 repeals the 2064 rules and saves actions under them.

Pinpoint / scope: Rules 10–11, 13–16, 39–40; Schedules 3–4; PDF pp. 4–7, 12, 15–16

Still to verify

Signed 22-page scan retrieved from the Board’s rules index. Confirm later amendments, current fees and notices, site restrictions and delegated signatory. Rule 16 permits location-specific restrictions; rule 15 exemptions require exact use and well classification. No guaranteed 30-day approval or universal extraction allowance is established.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP15Official indexed notice text reviewed

Official implementation notice

Provider-listing notice — Information Technology and Digital Governance Office

The official notice links separate listing application formats for data-center and cloud providers and references the 2081 directive.

Pinpoint / scope: Notice page dated 20 Mangsir 2082; separate application-form links

Still to verify

Read the notice attachment and both current forms. A webpage repost date does not establish a new legal deadline, extension, fee or continuing validity of the original transition period.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP16Selected authority provisions visually checked

Official Board-hosted Nepali Act

Water Supply Management Board Act, 2063 — Board-hosted Nepali text

Section 7(8)(c) authorizes the Valley Board to regulate, restrict or prohibit groundwater extraction/use and issue prescribed permits within its territory, except where prevailing law provides otherwise. Section 5 ties boundaries to Gazette notification; sections 35–36 provide rule/directive powers.

Pinpoint / scope: Sections 5, 7(8)(c), 35–36; PDF pp. 4, 6, 14

Still to verify

This Board copy lists an older amendment; it is not certified current consolidation. Obtain subsequent amendments and the operative geographic notifications. Institutional authority does not establish that a specific parcel or proposed extraction is approved.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP17Older text reviewed; present status unresolved

Official Board-hosted historical procedural text

Groundwater extraction/use permit directive, 2071 — older Board-hosted text

The older directive requests local recommendations, technical materials and local hearing/discussion reports for industrial, commercial and public uses. It sets a staged construction and abstraction process.

Pinpoint / scope: Cover approval note; clauses 6–8; PDF pp. 1, 4–5

Still to verify

The 2071 cover and older 2064-rule references differ from the Board’s later report referring to a 2073 directive. Retrieve that version and reconcile with 2082 rule 40. Do not present this older checklist, fees or hearing procedure as confirmed current requirements.

Open source ↗

Review / retrieval attempt: 2026-11-03

NP18Official role statement reviewed

Official institutional explanation

KVWSMB — published institutional roles

The Board identifies groundwater regulation and license issuance as its role. It describes KUKL as operating the transferred system under lease/license and places the Board office in Sainbu, Bhaisepati, Lalitpur.

Pinpoint / scope: Roles & Responsibilities; institutional setup; working office

Still to verify

This supports the institutional distinction, not a permit delegation to KUKL or proof of today’s named signatory. Read rule 39 delegation and obtain the current Board application instructions; no contact has been made.

Open source ↗

Review / retrieval attempt: 2026-11-03

What this edition does not establish

  • Evidence status describes what was actually examined, not whether a law is valid or effective.
  • Text reviewed does not mean current consolidated law verified. Indexed excerpts and official indexes remain separate from full-text review.
  • Valley update: Board authority and the 2082 deep-boring permit route are supported by reviewed Nepali text. Older 2064 rules were repealed; current directives, amendments and project applicability remain open.
  • A missing record means this research is incomplete. It does not establish a legal vacuum.
  • Comparison mechanisms are jurisdiction-specific. Proposed Nepal options are analytical questions, not statements of Nepal law.
  • No project pipeline, jobs forecast, water-use estimate or electricity-capacity claim has been verified in this edition.

Before relying on a rule, record the controlling Nepali text, amendments, commencement, geographic reach, covered actors, thresholds, exceptions, enforcement body and applicable project facts.