Data centers.
Public questions.

A U.S. policy atlas for the communities living with digital infrastructure. Understand the impacts. Find the sources. Ask better questions.

Explore the illustrated guide
Research edition · 2026-10-28-batch-9

27 source-verified records · 4 needs-review records · 16 official source leads · 38 provisions. This is a bounded sample, not a national legal survey. Several state measures need clause-level review, and one local ordinance record needs confirmation against current clean codification. Coverage does not establish that other laws do not apply.

Nepal: a comparative research track

Explore the initial legal baseline, source evidence levels, unresolved questions and policy mechanisms to evaluate in Nepal.

Open Nepal baseline & matrix →

Explore the policy landscape

Select a state or a topic to see the research collected so far.

Download research JSON ↓
Research coverage, not regulatory strictnessAlabamaAlaskaArizonaArkansasCaliforniaColoradoConnecticutDelawareDistrict of ColumbiaFloridaGeorgiaHawaiiIdahoIllinoisIndianaIowaKansasKentuckyLouisianaMaineMarylandMassachusettsMichiganMinnesotaMississippiMissouriMontanaNebraskaNevadaNew HampshireNew JerseyNew MexicoNew YorkNorth CarolinaNorth DakotaOhioOklahomaOregonPennsylvaniaRhode IslandSouth CarolinaSouth DakotaTennesseeTexasUtahVermontVirginiaWashingtonWest VirginiaWisconsinWyomingAlaskaHawaii15 of 50 states have a legal record or official lead · coverage is limited
Verified legal instrumentNeeds reviewOfficial source leadNot yet surveyedSelected

Dark shading marks a state with a source-verified instrument; amber marks a state with a needs-review instrument; green marks an official source lead; hatching means no data-center legal record or official lead has been added. These are research-status indicators, not complete surveys or statewide applicability claims. Alaska and Hawaii are inset; boundaries are illustrative.

Verified legal instruments

Operative provisions with source pinpoints, applicability, exceptions, and checked dates.

27 instruments · 34 provisions

This calibration sample is not a comprehensive state or federal survey. “Verified” means the official source text and stated scope were checked; the dataset is not independently reviewed legal advice.

Virginia · Local · OrdinanceSource-verified

Fairfax County Data Center Zoning Ordinance Amendment

For covered data centers in Fairfax County, the adopted zoning standards require noise studies before site-plan approval and before a Nonresidential Use Permit, equipment screening, and minimum distances from residential lots, subject to specified special-exception routes and transition rules.

ZO 112.1-2024-9 and ZO 112.2-2024-8 · Effective · checked 2026-10-28

Adopted2024-09-10Effective2024-09-11
NoiseParticipationLand use
Noise · Participation — provision

Submit a pre-site-plan noise study demonstrating compliance with County Code Chapter 108.1, and submit a post-construction noise study before issuance of a Nonresidential Use Permit; the Zoning Administrator must be satisfied.

Covered entities
Data center applications subject to the county's zoning standards and applicable review route
Threshold / exception
Applicability is governed by use tables, approval route, and transition provisions.
Existing facilities
Certain applications accepted or approved by July 16, 2024 may proceed under prior provisions if listed conditions are met.
Enforcement
Fairfax County Zoning Administrator; related noise ordinance enforcement authority not independently reviewed here; Zoning review and permit sequencing; separate noise-code remedies not analyzed
Pinpoint
ZO 112.1-2024-9 / 112.2-2024-8, § 4102.6.A(6), pp. 2–3; submission requirements, §§ 8101.2.E(12), 8101.3.D(8), pp. 3–4
Research note
The amendment cross-references Chapter 108.1 but does not itself state the decibel limits, measurement point, time period, or tonal adjustment.
Land use · Noise — provision

Covered buildings generally must be at least 200 feet from residential-zoning lot lines or property developed for residential use; ground equipment generally must be at least 300 feet away or shielded by the main building. Cooling and operating equipment must generally be enclosed, with a mechanical-feasibility exception and screening alternative. A special exception may authorize lesser residential distances.

Covered entities
Data centers governed by Fairfax County Zoning Ordinance § 4102.6.A
Threshold / exception
Mechanical-feasibility determination for enclosure; special exception for lesser distances; solar panels excluded from screening standard.
Existing facilities
Transition rules in Appendix 1, § 2.B preserve certain earlier applications and approvals.
Enforcement
Fairfax County zoning officials; Site-plan, special-exception, and permit review
Pinpoint
§ 4102.6.A(1), (4), pp. 2–3; Appendix 1, § 2.B, p. 4
Research note
Distance is measured from specified residential lot lines or developed residential properties. The Metro station distance rule is a distinct additional requirement.
Scope, status, and limitations
Applicability
Use-specific zoning standards apply according to the county's use tables and approval route. This amendment is a local zoning rule, not a Virginia-wide rule.
Exceptions / limits
Noise-study provisions require a showing of compliance with the separate County Noise Ordinance; this record does not independently normalize Chapter 108.1's measurement limits. The official amendment history page was checked for the listed adoption/effective dates and recent amendments.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Adopted Fairfax County data-center zoning amendment text (pp. 0–4; §§ 4102.6.A(1), (4), (6), 8101.2.E(12), 8101.3.D(8), Appendix 1 § 2.B) ↗Fairfax County adopted amendment history (112.1-2024-9 and 112.2-2024-8 – Data Centers) ↗
Read controlling official text ↗
Virginia · State · StatuteSource-verified

Siting of data centers; site assessment

Before approving specified land-use applications for a new high-energy-use facility reasonably expected to draw at least 100 MW from a retail electric utility, a locality must require an assessment of sound impacts on homes and schools within 500 feet and a utility form describing serving substations and anticipated voltage, to the extent known and practicable.

Va. Code § 15.2-2209.5 · Effective · checked 2026-10-28

AdoptedDate not verifiedEffectiveDate not verified
NoiseParticipation
Noise · Participation — provision

Before approval of a covered application for a new HEUF, the locality must require an applicant site assessment of the facility sound profile on residential units and schools within 500 feet of the facility boundary, to the extent practicable and within the referenced application timeline.

Covered entities
Applicant for a new high-energy-use facility in a rezoning, special-exception, or special-use-permit process
Threshold / exception
At least 100 MW reasonably anticipated from a retail electric utility at filing
Existing facilities
Existing approval exception in subsection F; existing local zoning authority preserved.
Enforcement
Locality reviewing the covered application; Assessment required before approval; locality considers assessment for plan and legal consistency
Pinpoint
Va. Code § 15.2-2209.5(A)–(D), (F)–(G)
Research note
The statute mandates only sound assessment; the separate water/agriculture/park/historic/forest assessments are discretionary under subsection B.
Scope, status, and limitations
Applicability
A locality may also require assessments of water, agricultural, park, historic-site, and forestland effects. The statute preserves local zoning authority and does not transfer State Corporation Commission jurisdiction. A limited expansion/modification exception applies when added power does not reach 100 MW.
Exceptions / limits
The current Virginia Code text cites 2026 Acts chapters 567 and 568 but the source page does not display an effective date; date left unknown. Facility must meet the statutory HEUF threshold and a covered rezoning, special exception, or special use permit must be at issue.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Virginia Code § 15.2-2209.5 (Subsections A–G) ↗
Read controlling official text ↗
Federal · Federal · RegulationSource-verified

Stationary reciprocating engines: selected emergency-operation and compliance provisions

The federal hazardous-air-pollutant rule limits when an engine may qualify as an emergency stationary engine. For covered emergency engines, the rule allows emergency operation without a time limit, while separately limiting maintenance/testing and certain non-emergency operation; the 50-hour provisions have significant conditions and are not a universal data-center operating allowance.

40 C.F.R. pt. 63, subpt. ZZZZ, § 63.6640(f) · Effective · checked 2026-10-28

AdoptedDate not verifiedEffectiveDate not verified
Air qualityPower
Air quality · Power — provision

Covered emergency stationary RICE may operate without a time limit during an emergency situation. A separate 100-hour annual cap generally applies to specified maintenance/readiness testing, with up to 50 non-emergency hours counted within that 100-hour allowance and subject to restrictions that vary by source category.

Covered entities
Owners/operators of stationary RICE subject to Subpart ZZZZ emergency-engine provisions
Threshold / exception
Equipment and source-category applicability is determined under Subpart ZZZZ; not a data-center MW threshold.
Existing facilities
Different standards can apply by engine age, construction/reconstruction date, site rating, and major/area source status.
Enforcement
U.S. EPA and delegated air agencies; Compliance demonstrations, reporting, emission/operating limits, and Clean Air Act enforcement
Pinpoint
40 C.F.R. § 63.6640(f)(1)–(4), as of 2026-10-26
Research note
Do not transfer this provision to compression-ignition engines under § 60.4211 or spark-ignition engines under § 60.4243 without checking those subparts separately.
Scope, status, and limitations
Applicability
Applicability depends on engine type, size, construction/reconstruction date, HAP source classification, and other subpart requirements. This entry summarizes selected provisions only; it is not a facility air-permit determination.
Exceptions / limits
eCFR text was current through 2026-10-26 when checked. EPA separately states that operation under certain 202(c) emergency orders is treated as an emergency situation for cited rules; later orders and equipment-specific rules must be checked.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
40 C.F.R. § 63.6640 (§ 63.6640(a)–(f); particularly (f)(1)–(4)) ↗Air standards and permitting for power equipment (Clean Air Act Resources for Data Centers; Spring and Summer 2026 DOE 202(c) Emergency Orders) ↗
Read controlling official text ↗
Minnesota · State · StatuteSource-verified

Preapplication evaluation of certain water appropriation projects

For a data center proposing more than 100 million gallons/year of consumptive use that needs a new individual permit or permit amendment, DNR may request specified project and water-use information and must respond in writing about potential water availability constraints. Communications and exchanged information under this subdivision are classified as nonpublic.

Minn. Stat. § 103G.265, subd. 5; 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 3 · Effective · checked 2026-10-28

Adopted2025-06-14Effective2025-06-15
WaterParticipation
Water · Participation — provision

DNR may request a project description, maximum-day/month and annual water estimates, water source, and water-quality/temperature needs, then must respond in writing about potential water-availability constraints. Communications and records under the process are nonpublic.

Covered entities
Minnesota data center project meeting the statutory water-use and permit trigger.
Threshold / exception
Proposed consumptive use greater than 100,000,000 gallons/year and new individual permit or permit amendment.
Existing facilities
The procedure does not replace environmental review, well-construction approval, or permit review.
Enforcement
Minnesota Department of Natural Resources; Written availability-constraint response; other water permits/reviews remain applicable.
Pinpoint
Minn. Stat. § 103G.265, subd. 5(a)–(g); 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 3
Research note
Track water availability transparency separately from permit conditions; disclosure rules materially affect residents’ ability to review demand forecasts.
Scope, status, and limitations
Applicability
Data centers as defined by Minn. Stat. § 216B.02, subd. 11; proposed consumptive use must exceed 100,000,000 gallons per year and require a new individual permit or permit amendment.
Exceptions / limits
The agency may request preapplication information; the law classifies those communications and records as nonpublic. The process does not replace environmental review, well approval, or appropriation-permit review.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Minn. Stat. § 103G.265, subd. 5 (Subd. 5(a)–(g); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 3) ↗Minnesota Laws 2025, First Special Session, chapter 12 (Sections 3–4, 9, 16–17; signed June 14, 2025) ↗
Read controlling official text ↗
Minnesota · State · StatuteSource-verified

Large water appropriation projects; permit conditions

For covered data-center permits exceeding 100 million gallons/year of new or additional consumptive use, DNR must ensure public health, safety, and welfare; reasonably consider conservation and watershed-health measures; and address water-use conflicts. DNR must require an aquifer test when it finds one necessary for public-health protection.

Minn. Stat. § 103G.271, subd. 5b; 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 4 · Effective · checked 2026-10-28

Adopted2025-06-14Effective2025-06-15
Water
Water — provision

For covered new/modified permits, DNR must protect public health, safety, and welfare; reasonably consider conservation, efficient-use, and watershed-health measures; address water conflicts; and require an aquifer test when necessary for the health/safety/welfare finding.

Covered entities
Minnesota DNR permit applicants for covered data-center water use, including permittees supplying the stated volume.
Threshold / exception
New/additional consumptive use greater than 100,000,000 gallons/year; or existing permit supplying more than that annual volume to a data center.
Existing facilities
Applies to new/modified permits and existing permits under the stated supply/use condition.
Enforcement
Minnesota Department of Natural Resources; Permit conditions, conflict review, and aquifer testing where required.
Pinpoint
Minn. Stat. § 103G.271, subd. 5b(a)–(b); 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 4
Research note
Threshold refers to consumptive use. Distinguish withdrawal from consumption and calculate on the statute’s annual basis.
Scope, status, and limitations
Applicability
New or modified permits for a data center with proposed new/additional consumptive use over 100,000,000 gallons/year, or an existing permit where more than that amount will be supplied to a data center.
Exceptions / limits
The text addresses consumptive use, not a general cap on all withdrawals; permit-specific terms and the referenced Minnesota Rules water-conflict process require separate review.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Minn. Stat. § 103G.271, subd. 5b (Subd. 5b(a)–(b); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 4) ↗Minnesota Laws 2025, First Special Session, chapter 12 (Sections 3–4, 9, 16–17; signed June 14, 2025) ↗
Read controlling official text ↗
Minnesota · State · StatuteSource-verified

Service to very large customers

Minnesota requires the PUC to define a very-large-customer class or subclass for each electric public utility by December 15, 2026. In reviewing a utility tariff or service agreement, the Commission must consider cost assignment, clean-energy benchmarks, protection against stranded costs for other customers, and other public-interest outcomes.

Minn. Stat. § 216B.1622; 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 9 · Effective · checked 2026-10-28

Adopted2025-06-14Effective2025-06-15
PowerParticipation
Power · Participation — provision

By December 15, 2026, the PUC must establish a very-large-customer class/subclass for each public electric utility. In reviewing tariffs or service agreements, the PUC must consider assignment of attributable costs, compliance with state electricity benchmarks, protections against stranded costs for other utility customers, and other public-interest outcomes.

Covered entities
Minnesota public utilities and customers meeting the class definition that the Commission establishes.
Threshold / exception
Threshold and customer characteristics to be set by PUC order; statute itself has no MW number.
Existing facilities
Agreements existing/renewed/extended and pre-2020 active-service customers are excluded under subd. 3.
Enforcement
Minnesota Public Utilities Commission; Commission order/rate case and review of utility tariffs or service agreements.
Pinpoint
Minn. Stat. § 216B.1622, subds. 1–3; 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 9
Research note
As checked Oct. 28, 2026, the statutory Dec. 15, 2026 classification deadline remained in the future. Check PUC docket/orders after that date.
Scope, status, and limitations
Applicability
Public utilities and customers that meet the Commission-defined very-large-customer class. The statute does not itself specify a MW threshold for the class.
Exceptions / limits
The statutory deadline is December 15, 2026; as checked October 28, 2026, the implementation deadline had not yet passed. This statute does not itself establish a finished tariff or identify each utility customer covered. Existing/renewed/extended agreements and customers served before 2020 are excluded under subd. 3.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Minn. Stat. § 216B.1622 (Subds. 1–3; 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 9) ↗Minnesota Laws 2025, First Special Session, chapter 12 (Sections 3–4, 9, 16–17; signed June 14, 2025) ↗
Read controlling official text ↗
Minnesota · State · StatuteSource-verified

Qualified large-scale data center fee

Commerce must collect an annual fee based on the utility-arranged peak-demand forecast: $2 million for 100–250 MW; $3 million above 250 and below 500 MW; $4 million for 500 and below 750 MW; and $5 million at 750 MW or greater. Fee data are classified as nonpublic.

Minn. Stat. § 216B.72; 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 16 · Effective · checked 2026-10-28

Adopted2025-06-14Effective2025-06-15
PowerPublic finance
Power · Public finance — provision

Commerce must collect an annual fee using the forecast peak demand that the utility arranges to serve: $2 million for 100–250 MW; $3 million above 250 and below 500 MW; $4 million for 500 and below 750 MW; $5 million at 750 MW or above. The fee supports an energy/conservation account and the fee data are nonpublic.

Covered entities
Qualified large-scale data centers meeting the linked statutory definition.
Threshold / exception
Utility-arranged forecast peak demand: 100 MW or more.
Existing facilities
Applies annually to qualified large-scale data centers.
Enforcement
Minnesota Department of Commerce; Annual fee collection; fee data classified nonpublic.
Pinpoint
Minn. Stat. § 216B.72(a)–(c); 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 16
Research note
Keep MW peak demand separate from MWh energy consumption. Confidential fee data may limit public visibility of assessments.
Scope, status, and limitations
Applicability
Qualified large-scale data centers under the statutory definition, with fee tier based on MW of peak demand the utility arranges to serve.
Exceptions / limits
The fee is not based on actual energy consumption (MWh). The statute delegates schedule details to the commissioner; do not infer incidence or local/community allocation from the fee alone.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Minn. Stat. § 216B.72 (Subds. (a)–(c); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 16) ↗Minnesota Laws 2025, First Special Session, chapter 12 (Sections 3–4, 9, 16–17; signed June 14, 2025) ↗
Read controlling official text ↗
Minnesota · State · StatuteSource-verified

Qualified data-center sales and use tax exemption

Minnesota exempts qualifying enterprise IT equipment and software purchases for certified data centers; qualifying large-scale centers need at least 25,000 square feet and $250 million in aggregate qualifying investment over 60 months. Large-scale centers must meet prevailing-wage and recognized sustainability/green-building requirements or may face tax recapture.

Minn. Stat. § 297A.68, subd. 42; 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 17 and ch. 13, art. 3, § 4 · Effective · checked 2026-10-28

Adopted2025-06-14Effective2025-07-01
Public financePowerLand use
Public finance · Power · Land use — provision

Certified data centers may receive sales/use tax refunds for eligible enterprise IT equipment and software. A qualified large-scale facility has a 25,000-square-foot minimum and $250 million collective investment threshold over 60 months; it must meet prevailing-wage conditions and obtain an accepted sustainability/green-building certification within three years after service, or the exemption amount is repayable.

Covered entities
DEED-certified qualified, refurbished, or qualified large-scale data centers and eligible owners/tenants/purchases.
Threshold / exception
Large-scale tier: at least 25,000 square feet and $250,000,000 aggregate facility/tenant qualifying investment in 60 months beginning after June 30, 2025.
Existing facilities
Qualification windows differ by facility type; purchases may qualify within 35 years of first qualifying purchase; certification must occur before July 1, 2042.
Enforcement
Minnesota DEED, Revenue, and Commerce according to the requirement; Certification, tax refund/exemption, labor enforcement, and recapture if green-building requirement is not met.
Pinpoint
Minn. Stat. § 297A.68, subd. 42(a), (e)–(n); 2025 Minn. Laws, 1st Spec. Sess., ch. 12, § 17; ch. 13, art. 3, § 4
Research note
The 2025 amendments removed electricity treatment for purchases after June 30, 2025. Do not describe this as a blanket tax exemption for all data-center costs.
Scope, status, and limitations
Applicability
Facilities meeting the separate statutory qualification tiers and certified by DEED; large-scale tier includes the square-footage and investment threshold.
Exceptions / limits
The large-scale exemption is available for certification before July 1, 2042 and qualifying purchases within 35 years of the first qualifying purchase. Electricity is not included for purchases after June 30, 2025; legacy and refurbished eligibility criteria differ.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Minn. Stat. § 297A.68, subd. 42 (Subd. 42(a), (e)–(n); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 17; ch. 13, art. 3, § 4) ↗Minnesota Laws 2025, First Special Session, chapter 12 (Sections 3–4, 9, 16–17; signed June 14, 2025) ↗
Read controlling official text ↗
Pennsylvania · State · StatuteSource-verified

Computer Data Center Equipment Incentive Program: sales and use tax exemption

The Commonwealth exempts covered equipment for installation in a certified computer data center, subject to statutory exclusions. The owner’s qualification period can last through the 25th full calendar year after the application year; a qualified tenant’s period ends at the earlier of its agreement term or the 10th full calendar year after agreement.

61 P.S. § 2931-D; 2024 Act 56, § 30(12) · Effective · checked 2026-10-28

Adopted2021-06-30Effective2022-01-01
Public financePower
Public finance · Power — provision

Certified computer data centers and qualified tenants may claim an exemption for covered equipment purchased for installation during the applicable qualification period.

Covered entities
Owners/operators and qualified tenants of certified Pennsylvania computer data centers.
Threshold / exception
Certification under related Subarticle C provisions; this section defines owner and tenant qualification periods.
Existing facilities
Owner period runs through the 25th full calendar year after application year; tenant period ends at agreement expiry or the 10th full calendar year after contract year, whichever comes first.
Enforcement
Pennsylvania Department of Revenue under the certification program; Tax exemption; related statutory provisions govern certification and disqualification.
Pinpoint
61 P.S. § 2931-D(a)–(d); 2024 Act 56, § 30(12)
Research note
Eligibility standards, application steps, and recapture should be verified against the linked related sections before advising a specific applicant.
Scope, status, and limitations
Applicability
Owner/operator or qualified tenant of a computer data center certified under the statutory program. Certification standards are in related sections and must be checked for an applicant-specific determination.
Exceptions / limits
Excludes specified internal-use telecom centers, equipment for electricity generation/resale or supplying more than 5% of facility electricity outside the center, proof-of-work crypto mining, and laptops/handheld devices/vehicles. 2024 Act 56 applies the crypto-mining exclusion to taxable years beginning after Dec. 31, 2025.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
61 P.S. § 2931-D (§ 2931-D(a)–(d); as amended by 2024 Act 56, § 30(12)) ↗
Read controlling official text ↗
Federal · Federal · RegulationSource-verified

Stationary compression-ignition engine compliance requirements

For covered stationary compression-ignition engines, owners/operators must follow applicable engine standards, installation/maintenance instructions, testing and monitoring rules. Emergency engines have a separate operating category with conditional maintenance/testing and non-emergency hours; the 50-hour allowance is restricted and does not generally authorize peak shaving or demand response.

40 C.F.R. § 60.4211 · Effective · checked 2026-10-28

AdoptedDate not verifiedEffectiveDate not verified
Air qualityPower
Air quality · Power — provision

Covered stationary compression-ignition engine owners/operators must follow applicable emissions and operating standards. Emergency engines have unlimited hours during qualifying emergencies, generally up to 100 annual hours for specified maintenance/readiness testing, and up to 50 non-emergency hours only under conditions; most cannot use those hours for peak shaving or demand response.

Covered entities
Owners/operators of stationary CI engines subject to 40 C.F.R. part 60, subpart IIII.
Threshold / exception
Engine type, model year, maximum engine power, construction/installation and applicable source category determine coverage.
Existing facilities
Different standards apply to pre-2007 and later engines, fire pumps, and non-emergency engines.
Enforcement
U.S. EPA or delegated air agency; Certified engines, maintenance/operating conditions, testing/monitoring, and Clean Air Act enforcement.
Pinpoint
40 C.F.R. § 60.4211(a), (f)–(g), current eCFR as of 2026-10-26
Research note
Do not infer emergency status from labels alone. Analyze the relevant engine subpart, permit, emergency-order policy, source status, and dispatch arrangement.
Scope, status, and limitations
Applicability
Stationary compression-ignition engines within 40 C.F.R. part 60, subpart IIII; applicability varies with engine model year, power, construction and source category.
Exceptions / limits
Selected § 60.4211 requirements only; a facility-specific determination also requires other subpart provisions, permit terms, and equipment facts. Current eCFR is authoritative but unofficial; it displayed text through 2026-10-26.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
40 C.F.R. § 60.4211 (§ 60.4211(a), (f)–(g), current eCFR displayed through 2026-10-26) ↗
Read controlling official text ↗
Utah · State · StatuteSource-verified

Data Center Water Transparency Amendments

For covered new large data centers, Utah requires water-agency notice and projected-use reporting before construction, followed by annual withdrawal and conservation reporting. Most reported withdrawal data are made public, with statutory protections for specified proprietary information.

Utah HB 76 (2026), Utah Code § 73-5-8.3 · Effective · checked 2026-10-28

AdoptedDate not verifiedEffective2026-05-06
WaterParticipationLand use
Water · Participation · Land use — provision

Before approval of a land-use application for a covered new large data center, local authorities must notify the Division of Water Rights, Division of Water Quality, and any relevant water provider. Operators must report projected water needs, annual withdrawals, discharge treatment/temperature, and reuse/replacement plans 90–360 days before construction; after operations begin, annual actual withdrawal and conservation reporting is required. The Division publishes individual withdrawal data and county aggregates for qualifying protected information.

Covered entities
Operators of statutory large data centers and municipal/county land-use authorities considering a new large data center application.
Threshold / exception
At least 75 acre-feet annual withdrawal and at least 10,000 square feet, plus detailed facility, infrastructure, ownership, and parcel criteria; new large data center means begins operations on/after July 1, 2026.
Existing facilities
Annual reporting applies to covered new large data centers beginning operations on/after July 1, 2026; existing facilities outside that definition are not brought in by this provision.
Enforcement
Utah Division of Water Rights / State Engineer; Notice of incomplete/non-filed report; fine up to $100 per day for continued failure after notice.
Pinpoint
Utah Code § 73-5-8.3(1)(d),(f), (2)–(6), enrolled HB 76 pp. 3–7; effective-date clause p. 7
Research note
Do not characterize the measure as a withdrawal cap. The definition contains multiple facility/ownership criteria; statutory annual withdrawals are not synonymous with consumptive use.
Scope, status, and limitations
Applicability
A covered large data center must meet statutory ownership/facility criteria, have at least 10,000 square feet, and withdraw at least 75 acre-feet annually. New large data centers begin operations on or after July 1, 2026; preconstruction and annual reporting duties use that applicability definition.
Exceptions / limits
This is a reporting, notice, and disclosure law, not a general water-use cap or substitute for water-right, discharge, or wastewater permits. Certain submitted information may be protected and aggregated by county.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
HB 76 — Data Center Water Transparency Amendments (enrolled act) (Utah Code § 73-5-8.3(1)–(6), enrolled HB 76 §§ 2–3, pp. 3–7) ↗
Read controlling official text ↗
Virginia · State · StatuteSource-verified

Permits for data centers; emission limits for certain engine-generator sets

For covered data-center air-permit applications filed on or after July 1, 2026, DEQ cannot issue the permit unless the limit for each engine-generator is no higher than emissions from a Tier 4-equivalent set.

Va. Code § 10.1-1322.6; 2026 Acts ch. 397 (HB 507) · Effective · checked 2026-10-28

Adopted2026-04-08Effective2026-07-01
Air qualityclimateParticipation
Air quality · climate · Participation — provision

DEQ may not issue an air permit, including general-permit coverage, for a data-center application filed on/after July 1, 2026 unless each engine-generator's permitted emission limit is equal to or below Tier 4-equivalent emissions for the listed pollutants.

Covered entities
Applicants for data-center permits under Virginia's air pollution control chapter; each engine-generator covered by the permit.
Threshold / exception
Application submission date on/after July 1, 2026. Tier 4 equivalent means selective catalytic reduction or equivalent for NOx, diesel oxidation catalyst or equivalent for CO, and diesel particulate filter or equivalent for particulate matter.
Existing facilities
Application-date trigger; existing permits are not expressly converted by this section alone.
Enforcement
Virginia Department of Environmental Quality / Air Pollution Control Board under the air-permitting chapter; Permit issuance gate and applicable permit enforcement mechanisms.
Pinpoint
Va. Code § 10.1-1322.6(A)–(C); 2026 Acts ch. 397
Research note
The benchmark is defined in terms of emissions achieved by a Tier 4-equivalent set, not a requirement that every gen-set be a particular model. The statute preserves BACT, LAER, RACT, NSPS, NESHAP and stricter permit limits.
Scope, status, and limitations
Applicability
Applies to an air permit under the chapter, including general-permit coverage, for a data-center application submitted on or after July 1, 2026. Tier 4 equivalent includes equivalent NOx, carbon-monoxide, and particulate controls.
Exceptions / limits
This permit gate does not automatically require replacement of existing equipment and preserves stricter permit controls and other federal/state standards. Verify facility and application facts for any site-specific conclusion.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Va. Code § 10.1-1322.6 — data-center engine-generator emission limits (Subsections A–C; Tier 4 equivalent definition and permit application trigger) ↗HB 507 (2026), official bill history and Chapter 397 effective date (History: Approved by Governor Apr. 8, 2026; Chapter 397; effective July 1, 2026) ↗
Read controlling official text ↗
Ohio · Utility · TariffSource-verified

Ohio Power Company Schedule DCT (Data Center Tariff)

Ohio Power’s data-center tariff applies to qualifying loads above 25 MW and sets minimum monthly billing-demand floors. New loads face an 85% ramp-capacity floor and a later tiered minimum, which can require payment for substantial contracted capacity even when actual use is lower.

Ohio Power P.U.C.O. No. 22, Schedule DCT, sheets 223-2 to 223-5 · Effective · checked 2026-10-28

AdoptedDate not verifiedEffective2026-08-28
PowerParticipation
Power · Participation — provision

Schedule DCT imposes minimum monthly billing demand floors. Existing load is billed at no less than 60% of contract capacity or the highest billing demand in the preceding 11 months, as written in the sheet. New load billing demand is at least 85% of ramp contract capacity during the ramp; afterward it is at least the greater of 85% of the highest recent billing demand or a tiered Minimum Demand formula, capped at 85% of contract capacity at the top tier.

Covered entities
Ohio Power customers with qualifying data-center load under Schedule DCT; associated affiliates/new loads are aggregated according to tariff definitions.
Threshold / exception
Generally >25,000 kW (25 MW) monthly maximum demand at a single location or aggregated total customer contract capacity in the service territory; see tariff for separate existing/new load rules.
Existing facilities
Existing Load and New Load have separate minimum-demand formulas and transition definitions.
Enforcement
Ohio Power Company under PUCO-approved tariff; PUCO oversees regulated service.; Minimum monthly tariff billing; tariff allows suspension with Commission approval if use exceeds contract capacity by more than 1,000 kW.
Pinpoint
Ohio Power P.U.C.O. No. 22, Schedule DCT, sheets 223-2–223-4; issued/effective Aug. 28, 2026
Research note
Tariff text is controlling. The existing-load sentence is disjunctive; reproduce the precise tariff formula in any calculation. Do not treat billing demand as energy consumption (kWh/MWh). Applies to Ohio Power service territory only.
Power · Participation — provision

Schedule DCT requires a customer to give at least 180 days' written notice before returning to or beginning Standard Service Offer service. The utility procures energy separately, with the full cost assigned to the data-center customer; if notice is not given, PJM spot-market costs are assigned to that customer under the tariff/order text.

Covered entities
Ohio Power Schedule DCT customers electing Standard Service Offer supply.
Threshold / exception
Eligible Schedule DCT customer; the schedule's >25 MW applicability and related definitions govern.
Existing facilities
Current sheets filed/effective Aug. 28, 2026 incorporate the August 5, 2026 PUCO order for the identified SSO procedure.
Enforcement
Public Utilities Commission of Ohio and Ohio Power Company; Tariff procurement and customer-specific cost assignment; detailed remedy governed by order and tariff.
Pinpoint
Ohio Power P.U.C.O. No. 22, Schedule DCT, sheets 223-4–223-5; PUCO Aug. 5, 2026 release and Case 26-113-EL-ATA
Research note
The related order is challenged/reconsideration status may matter; no stay conclusion is made. Verify precise current terms and litigation status before future refresh.
Scope, status, and limitations
Applicability
Applies only to Ohio Power Company service. Eligibility is generally monthly maximum demand over 25,000 kW at a single location or aggregated customer contract capacity over 25,000 kW in the service territory, subject to detailed definitions and load categories.
Exceptions / limits
Tariff sheets 223-2–223-5 were issued/effective Aug. 28, 2026 and filed under PUCO cases 25-392-EL-AIR and 26-113-EL-ATA. Existing and new loads have distinct formulas and transition terms. The underlying tariff is challenged in Ohio Supreme Court No. 2025-1458; this batch did not identify a final disposition or verify a stay. Do not generalize to other Ohio utilities.
Litigation
Challenged; litigation review is not a finding that no challenge exists.
Sources
Ohio Power Company current tariff book — Schedule DCT (P.U.C.O. No. 22, Schedule DCT, sheets 223-2–223-5; issued/effective Aug. 28, 2026) ↗PUCO Aug. 5, 2026 data-center Standard Service Offer safeguards (Official Aug. 5, 2026 announcement; PUCO Case 26-113-EL-ATA) ↗
Read controlling official text ↗
Oregon · State · StatuteSource-verified

Large Energy Use Facilities

Oregon requires a separate electric-service class and tariff for qualifying very large computing facilities. Utilities must use long-term service contracts, at least ten years, with a commission-set minimum payment tied to projected electricity use.

Oregon 2025 HB 3546, 2025 Or. Laws ch. 323 · Effective · checked 2026-10-28

Adopted2025-06-16Effective2025-06-16
PowerParticipationclimate
Power · Participation · climate — provision

The PUC must provide a separate retail electric service classification and tariff for covered large energy use facilities. Tariffs must allocate or directly assign service costs and mitigate unwarranted cross-class cost shifts. Electric companies must enter into service contracts of at least ten years specifying start timing and a commission-determined minimum payment based on projected use; tariffs and contracts must also meet public-interest conditions.

Covered entities
Electric companies and retail electricity consumers that are large energy use facilities, as defined by the act.
Threshold / exception
At least 20 MW used or able to be used and primarily engaged in NAICS 2022 code 518210 services; statutory facility definition aggregates buildings/equipment at single, contiguous, or adjacent sites under common control.
Existing facilities
Section 6 applies to new service contracts and to certain earlier contracts when post-effective-date significant investments/costs could increase other customers' cost or risk.
Enforcement
Oregon Public Utility Commission; regulated electric companies; Commission-approved tariffs, contracts, and public-interest conditions; related enforcement under utility law.
Pinpoint
2025 Or. Laws ch. 323, §§ 2(1)–(3), 3, 5–6; enrolled HB 3546 pp. 1–3
Research note
Statutory framework is verified. Specific PGE implementation terms arise in separate Commission orders/tariffs, whose review and appeal status are not resolved here.
Scope, status, and limitations
Applicability
A covered facility uses or can use at least 20 MW and primarily provides NAICS 518210 services, under statutory definitions aggregating facilities at single/contiguous/adjacent sites under common control.
Exceptions / limits
The statute directs commission tariff design and contract terms but does not provide every utility's actual approved tariff terms. PGE implementation Order 26-154 and associated tariff action are under further procedural review; current Schedule 96 terms remain a separate research task.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Oregon HB 3546 (2025), enrolled act (2025 Or. Laws ch. 323, §§ 2–9; enrolled HB 3546, pp. 1–3) ↗Oregon PUC eDockets UM 2377 docket history (Orders 26-154 (May 7), 26-239 (July 10), 26-309 (Aug. 31), compliance advice filing (Sept. 15), appeal filing (Sept. 10, 2026)) ↗
Read controlling official text ↗
California · State · StatuteSource-verified

AB 1577, Data centers: energy and local-permit information

Owners/operators of data centers with at least 10 MW electrical capacity must report facility, energy, onsite generation/fuel, and efficiency data to the Energy Commission after energization and annually; local applicants for discretionary permits must disclose expected energy, onsite generation, and boundary sound levels.

Cal. AB 1577, ch. 434 (2026) · Enacted; operative reporting dates follow commission process · checked 2026-10-28

Adopted2026-09-21Effective2027-01-01
Participation
Participation — provision

For data centers of at least 10 MW, the operator reports specified facility and load information upon energization and annually; when seeking a covered discretionary local land-use approval, it submits estimated annual energy use, onsite generation, and average/maximum A-weighted operating sound at the property boundary.

Covered entities
Entities and projects within the enacted chapter
Threshold / exception
Data-center definition excludes facilities with electrical capacity below 10 MW. Separate local disclosure obligation applies upon application for covered discretionary land-use authorization.
Existing facilities
Reporting and disclosure transition provisions control.
Enforcement
California Energy Commission and local permitting authorities; Statutory filing, review, approval, or tariff procedures as applicable
Pinpoint
2026 Cal. Stats. ch. 434, §§ 1–3; Gov. Code §§ 7927.303, 65909.3; Pub. Res. Code § 25302.10(a)–(f)
Research note
This source record is based on the official bill/chapter page. Check chaptered text and any implementing CPUC/CEC/local action before relying on details; summaries do not substitute for statutory definitions. Clause-level effective dates, thresholds, and exceptions need review against the complete official chaptered act before legal reliance.
Scope, status, and limitations
Applicability
The measure creates specified reporting and permit-disclosure duties; covered facilities and disclosure details are governed by the act.
Exceptions / limits
Exempts specified publicly funded research, public safety, publicly funded national-security, publicly owned, and utility facilities. Commission publishes anonymized aggregated information; no customer-level energy-use disclosure. Local disclosure duty is triggered by application for discretionary permit, entitlement, or land-use authorization. Confirm Energy Commission reporting process and its dates before assessing facility compliance.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
AB 1577, Data centers: energy and local-permit information (Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.) ↗
Read controlling official text ↗
California · State · StatuteSource-verified

AB 2383, Data centers: electric service tariffs

Requires CPUC-approved T&D and generation tariffs for covered data-center customers, allocates class costs, and requires minimum 10-year generation payment commitments with collateral, early-exit/non-interconnection fees, and projected-load minimums for covered customers.

Cal. AB 2383, ch. 435 (2026) · Enacted; CPUC tariffs and CCA/ESP tariffs remain implementation dependent · checked 2026-10-28

Adopted2026-09-21Effective2027-01-01
Power
Power — provision

The CPUC must require electrical corporations to file T&D and generation tariffs for participating customers. The generation tariff includes at least a 10-year minimum payment mechanism, non-interconnection/early termination fees, upfront collateral or prepayment, and a cost-recovery floor based on projected load; commission threshold cannot exceed 25 MW. CCAs and ESPs must adopt generation tariffs by January 1, 2028.

Covered entities
Entities and projects within the enacted chapter
Threshold / exception
CPUC sets a minimum peak-demand threshold for generation tariff applicability, which cannot exceed 25 MW; CCA/ESP threshold also cannot exceed 25 MW.
Existing facilities
Provider and customer applicability is set by statutory terms.
Enforcement
California Public Utilities Commission and covered providers; Statutory filing, review, approval, or tariff procedures as applicable
Pinpoint
2026 Cal. Stats. ch. 435, Pub. Util. Code §§ 945.1, 945.4–945.6, 945.8
Research note
This source record is based on the official bill/chapter page. Check chaptered text and any implementing CPUC/CEC/local action before relying on details; summaries do not substitute for statutory definitions. Clause-level effective dates, thresholds, and exceptions need review against the complete official chaptered act before legal reliance.
Scope, status, and limitations
Applicability
Applicable electric corporations, and specified CCAs and ESPs under the act.
Exceptions / limits
Statutory duties are verified; exact filed and approved tariff sheets and customer-specific application remain implementation questions. Public text excludes certain facilities; electrical cooperatives are excluded from electrical-corporation definition.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
AB 2383, Data centers: electric service tariffs (Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.) ↗
Read controlling official text ↗
California · State · StatuteSource-verified

AB 2469, Data centers: water-supply assessment

Cities and counties cannot approve a discretionary or ministerial permit or entitlement for covered construction or an expansion increasing peak water use unless required water-supply/use, efficiency, and workforce information is supplied; from 2028, a drought-stage water-scarcity plan is required, and the applicant pays required water infrastructure costs.

Cal. AB 2469, ch. 436 (2026) · Enacted; water-scarcity plan applies beginning 2028 · checked 2026-10-28

Adopted2026-09-21Effective2027-01-01
WaterLand use
Water · Land use — provision

A city, county, or city-and-county may not approve a discretionary or ministerial entitlement for covered construction or expansion increasing maximum peak water use unless the applicant provides a Water Code water-supply assessment, projected water use and efficiency measures, and workforce information; starting January 1, 2028 it must also provide a drought-stage water-scarcity plan. The applicant assumes full cost of required water conveyance, treatment, storage, or distribution improvements as determined by the water supplier.

Covered entities
Entities and projects within the enacted chapter
Threshold / exception
New data center or expansion increasing maximum peak water use; no numeric facility size threshold in § 65964.7.
Existing facilities
Covers applications within statutory scope; verify project timing and transition rules from chapter text.
Enforcement
Local city/county permitting authorities; Statutory filing, review, approval, or tariff procedures as applicable
Pinpoint
2026 Cal. Stats. ch. 436, § 1; Gov. Code § 65964.7(a)–(c)
Research note
This source record is based on the official bill/chapter page. Check chaptered text and any implementing CPUC/CEC/local action before relying on details; summaries do not substitute for statutory definitions. Clause-level effective dates, thresholds, and exceptions need review against the complete official chaptered act before legal reliance.
Scope, status, and limitations
Applicability
City and county permit/entitlement applications for a new data center or expansion that increases peak water use.
Exceptions / limits
Applies to all cities including charter cities. A compliant applicant is not automatically entitled to approval. Plan requirement begins January 1, 2028; infrastructure cost paragraph is severable.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
AB 2469, Data centers: water-supply assessment (Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.) ↗
Read controlling official text ↗
California · State · StatuteSource-verified

SB 886, Data centers: electrical service and cost allocation

The CPUC must establish or update rules by January 1, 2028 for covered data-center transmission interconnections and retail service, including customer responsibility for transmission upgrades, a 10-year early termination/ramp-up fee, and safeguards against shifting costs to other ratepayers.

Cal. SB 886, ch. 438 (2026) · Enacted; CPUC implementation due by 2028; covered agreement rule begins 2027 · checked 2026-10-28

Adopted2026-09-21Effective2027-01-01
PowerPublic financeParticipation
Power · Public finance · Participation — provision

For a data center entering a new transmission-level interconnection agreement on or after January 1, 2027, the CPUC must establish a tariff requiring disclosure of applications in other service territories, assigning transmission upgrade/usage costs to the customer, and imposing an early termination fee if the customer departs within 10 years or fails adequate load ramp-up. By January 1, 2028 CPUC must establish/update interconnection and retail-service rules protecting nonparticipating customers from stranded costs.

Covered entities
Entities and projects within the enacted chapter
Threshold / exception
Applies to data centers with new transmission-level interconnection agreements on or after January 1, 2027; statutory definition of participating customer and facility controls.
Existing facilities
Statutory cutoff dates distinguish covered applications.
Enforcement
California Public Utilities Commission and electrical corporations; Statutory filing, review, approval, or tariff procedures as applicable
Pinpoint
2026 Cal. Stats. ch. 438, Pub. Util. Code §§ 945.2–945.3, 945.7, 945.9
Research note
This source record is based on the official bill/chapter page. Check chaptered text and any implementing CPUC/CEC/local action before relying on details; summaries do not substitute for statutory definitions. Clause-level effective dates, thresholds, and exceptions need review against the complete official chaptered act before legal reliance.
Scope, status, and limitations
Applicability
Specified large data-center customers seeking covered transmission-level service and other applications within the statute.
Exceptions / limits
Statutory terms verified. Customer-specific tariff and implementation details remain for CPUC action; scope is transmission-level interconnection and participating-customer service as specified.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
SB 886, Data centers: electrical service and cost allocation (Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.) ↗
Read controlling official text ↗
California · State · StatuteSource-verified

SB 887, Data centers: environmental review

CEQA applies to entitlements for covered data-center development and operation, and categorical exemptions are unavailable for covered projects (subject to statutory facility exclusions). The Governor may certify a qualifying project for the environmental-leadership pathway only after lead-agency certification of demanding conditions for grid cost responsibility, zero-carbon energy/storage, water-efficient cooling, community benefits, and related requirements. That pathway is conditional; the act does not automatically require an EIR for every project.

Cal. SB 887, ch. 439 (2026) · Enacted; CEQA applicability rule plus conditional streamlining pathway · checked 2026-10-28

Adopted2026-09-21Effective2027-01-01
Land useParticipationAir qualityWaterPowerclimatecommunity
Land use · Participation — provision

Makes CEQA applicable to covered data-center entitlements and constrains specified categorical-exemption pathways; an optional environmental-leadership certification route is subject to statutory conditions.

Covered entities
Entities and projects within the enacted chapter
Threshold / exception
Covered project/entitlement scope and optional certification criteria are specified in the act.
Existing facilities
Application depends on project and entitlement timing under the act.
Enforcement
Lead agencies under CEQA; Governor’s office for optional certification; Statutory filing, review, approval, or tariff procedures as applicable
Pinpoint
Cal. SB 887, ch. 439, §§ 1–3
Research note
This source record is based on the official bill/chapter page. Check chaptered text and any implementing CPUC/CEC/local action before relying on details; summaries do not substitute for statutory definitions. Clause-level effective dates, thresholds, and exceptions need review against the complete official chaptered act before legal reliance. Chaptered statutory text needs section-level review before legal reliance.
Land use · Air quality · Water · Power · climate · community · Participation — provision

CEQA applies to the issuance of entitlements related to covered data-center development and operation, and a public-agency project for that purpose cannot use a categorical exemption unless it falls within the specified statutory facility exclusions. Separately, a lead agency may certify a data-center project as meeting criteria for the Governor’s optional environmental-leadership certification pathway. Conditions include advance payment of full interconnection costs; no increase in statewide fossil-fuel consumption; zero-carbon storage sized for four hours at 100% of forecasted peak and used for demand response; behind-the-meter zero-carbon generation to the maximum extent feasible; enforceable payment for grid investments, including new generation, with an early-termination fee; recycled water and water-efficient or waterless cooling; 100% zero-carbon hourly electricity within five years (75% newly developed); specified program conditions; and a legally binding community benefits agreement. The lead agency and Governor certification steps are required for the optional pathway.

Covered entities
Public agencies issuing entitlements and lead agencies reviewing data-center projects; Governor and Office of Land Use and Climate Innovation for the optional environmental-leadership certification route.
Threshold / exception
Definition exclusions include publicly funded research, public safety, publicly funded national security, publicly owned, other utility/telecommunications facilities, and independent higher-education research facilities. Categorical exemptions are separately unavailable to covered data-center projects. The leadership route is conditional and does not exempt a project from CEQA.
Existing facilities
Applies to covered project entitlements related to development and operation; applicability to a particular existing facility or later permit depends on whether a new entitlement or covered project approval is involved.
Enforcement
CEQA lead agencies; Governor for environmental-leadership certification; Office of Land Use and Climate Innovation develops uniform statewide certification standards.; CEQA environmental review and mitigation; categorical-exemption restriction; conditional environmental-leadership certification with a concurrent administrative record and specified streamlining benefits; legally binding project conditions and community-benefits agreement.
Pinpoint
Cal. Pub. Res. Code §§ 21061.6, 21080.08, 21084(f), 21180(b)(5), 21183.6; 2026 Cal. Stats. ch. 439, §§ 2–6.
Research note
Do not equate loss of a categorical exemption with an automatic EIR. The chaptered text states that CEQA applies and categorical exemption is unavailable; normal CEQA determinations remain fact- and record-dependent. The CEQA statutory definition and § 21084(f) exclusion list are related but not identical.
Scope, status, and limitations
Applicability
CEQA entitlement rule for a data center as defined in Pub. Resources Code § 21061.6; the categorical-exemption restriction applies to a project proposed to be carried out or approved by a public agency in furtherance of data-center development/operation, subject to § 21084(f)(2) exclusions. Separate leadership-project provisions require lead-agency certification and gubernatorial certification.
Exceptions / limits
The law removes categorical exemptions for covered data-center projects; it does not direct an EIR in every case or eliminate negative declarations/other CEQA determinations based on the record. Environmental-leadership certification is a conditional option with project-specific statutory criteria and is not an exemption from CEQA. Existing leadership-program statutory sunset is January 1, 2032. Official California Legislature site confirmed chapter status but returned 403 for full text in this research environment; chaptered text was reviewed on an accessible mirror and must be rechecked against the official chaptered act when obtainable.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
SB 887, Data centers: environmental review (Cal. Pub. Res. Code §§ 21061.6, 21080.08, 21084(f), 21180(b)(5), 21183.6; 2026 Cal. Stats. ch. 439, §§ 2–6. Official bill page confirms chapter status; chaptered text read from mirror because official endpoint returned 403.) ↗
Read controlling official text ↗
California · State · StatuteSource-verified

SB 1168, Data centers: electrical service rate assessment

Directs the CPUC to assess rate opportunities intended to ensure large data-center customers bear a reasonable share of transmission/distribution and procurement costs and to alleviate residential cost pressure.

Cal. SB 1168, ch. 440 (2026) · Enacted; directs CPUC assessment · checked 2026-10-28

Adopted2026-09-21Effective2027-01-01
PowerPublic finance
Power · Public finance — provision

Directs the CPUC to assess rate opportunities that allocate a reasonable share of transmission, distribution, and procurement costs to large data-center customers and address residential rate pressure.

Covered entities
Entities and projects within the enacted chapter
Threshold / exception
Commission assessment; the act does not itself set a final rate.
Existing facilities
Commission action follows statutory direction.
Enforcement
California Public Utilities Commission; Statutory filing, review, approval, or tariff procedures as applicable
Pinpoint
Cal. SB 1168, ch. 440, § 1
Research note
This source record is based on the official bill/chapter page. Check chaptered text and any implementing CPUC/CEC/local action before relying on details; summaries do not substitute for statutory definitions. Clause-level effective dates, thresholds, and exceptions need review against the complete official chaptered act before legal reliance. Chaptered statutory text needs section-level review before legal reliance.
Scope, status, and limitations
Applicability
The commission’s assessment of specified data-center electricity cost allocation.
Exceptions / limits
Directs an assessment of possible cost-allocation approaches; it does not itself adopt a tariff, set a large-customer rate, or guarantee reduced residential bills.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
SB 1168, Data centers: electrical service rate assessment (Cal. SB 1168, ch. 440, § 1) ↗
Read controlling official text ↗
Florida · State · StatuteSource-verified

Large-scale data centers: water allocation safeguards and conservation plans

Water districts or DEP may not grant covered allocations when the statutory harm or land-use condition applies; reclaimed water and conservation planning are required under specified conditions.

Fla. Stat. § 373.262; 2026 ch. 2026-65, § 5 · Effective · checked 2026-10-28

Adopted2026-05-22Effective2026-07-01
WaterLand useParticipation
Water · Land use · Participation — provision

A water district or DEP may not grant a covered allocation when proposed use would harm local water resources or conflict with local zoning/comprehensive-plan limits; reclaimed water must be used instead of some or all groundwater/surface water where statutory suitability and feasibility conditions are satisfied. Applications averaging at least 100,000 gallons per day must include all water sources and a conservation plan and cannot be approved without a hearing.

Covered entities
Large-scale data centers applying for water allocations from a water management district or DEP.
Threshold / exception
Average allocation of at least 100,000 gallons/day triggers specified source disclosure, conservation-plan, and hearing conditions.
Existing facilities
Applies to allocation applications within statutory scope; verify transition and permit facts for each facility.
Enforcement
Florida water management districts or DEP; Allocation denial, conservation-plan review, and public hearing under the statute
Pinpoint
Fla. Stat. § 373.262(1)–(5), especially (2), (4)–(5)
Research note
The hearing/plan threshold is distinct from the separate statutory grounds for denying an allocation. The act does not create a universal water-volume cap.
Scope, status, and limitations
Applicability
Applications for water allocations to large-scale data centers under Florida Stat. § 373.262.
Exceptions / limits
The reclaimed-water condition has feasibility, availability, capacity, quality, access, and permit-consistency prerequisites. The hearing and conservation-plan requirements apply at the statutory average-allocation threshold.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Large-scale data centers: water allocation safeguards and conservation plans (Fla. Stat. § 373.262(1)–(5); 2026 ch. 2026-65, § 5) ↗
Read controlling official text ↗
Pennsylvania · State · Executive orderSource-verified

Executive Order 2026-05: responsible data-center development

Pennsylvania directs covered agencies to apply public permitting, transparency, and consumer-protection procedures. Projects over 25 MW that commit to GRID requirements can use a consent-agreement review path; projects without that agreement must clear specified local and water approvals before DEP starts reviewing permits. The order also requires no NDAs for Governor-controlled agencies, a public DEP project map, and annual energy/water reporting.

Executive Order 2026-05; 4 Pa. Code ch. 7, subch. RRR · Effective · checked 2026-10-28

Adopted2026-08-18Effective2026-08-18
PowerLand useWaterParticipationAir qualityPublic financecommunity
Power · Land use · Water · Participation — provision

The order directs covered agencies to provide a coordinated public permit-review pathway for qualifying projects; projects above 25 MW seeking the GRID pathway must execute the template consent order and agreement. If an applicant declines GRID, permit review cannot proceed until required local approvals; fast-track treatment is removed for data-center projects.

Covered entities
Pennsylvania executive agencies and covered data-center permit applications; GRID pathway threshold applies to projects above 25 MW peak demand.
Threshold / exception
More than 25 MW peak demand for specified GRID pathway commitments.
Existing facilities
Applies to permit applications filed after the effective date as specified in the order.
Enforcement
Pennsylvania executive agencies administering covered permit programs; Permit sequencing, conditions where authorized, public reporting, and executive-branch oversight.
Pinpoint
56 Pa. Bull. 5950 et seq.; 4 Pa. Code §§ 7.1081–7.1089
Research note
Do not describe the order as a statewide local zoning mandate. Authority is limited to the Governor’s executive agencies and applicable permits; separate independent PUC proceedings are not final regulatory terms.
Power · Water · Air quality · Participation · Land use · Public finance · community — provision

For a project over 25 MW using the GRID pathway, DEP must develop a consent-order template; applicants must commit to GRID conditions, identify local approvals, and execute a project agreement. DEP may issue qualifying permits on a rolling basis only after local-plan consistency and required local approvals are documented. For a >25 MW project without that agreement, DEP cannot begin review until local approvals and any required water-withdrawal/wastewater authorizations are documented; permits cannot be issued on a rolling basis, and PAyback/Permit Decision Guarantee timelines do not apply. Governor-controlled agencies may not use NDAs for a data-center project; DEP must publish a current project map and notify operating centers to report annual energy and water data starting July 1, 2027. The order directs the Governor's special counsel to advocate for PUC rules on curtailment and cost allocation; DEP to recommend any needed backup-generator/air/water regulations; and DCED to prepare local zoning and community-benefit best practices.

Covered entities
Projects over 25 MW and agencies within the Governor's jurisdiction; separate provisions address all data-center-related NDAs with covered agencies and annual reporting by operating centers.
Threshold / exception
Peak demand over 25 MW for the DEP project review paths. Annual reporting begins July 1, 2027 for operating data centers under the referenced Fiscal Code reporting provision.
Existing facilities
Section 7.1083(c) directs DEP to notify currently operating centers to comply with annual energy/water reporting by July 1, 2027 and each year thereafter.
Enforcement
Governor-controlled agencies; Pennsylvania PUC retains its statutory and regulatory decision-making authority.; Project-specific consent agreements and permit conditions; local and water authorization sequencing; annual reports and public map; directions to advocate for PUC action and recommend agency rulemaking; local-government best-practice guidance.
Pinpoint
4 Pa. Code §§ 7.1082(a)–(e), 7.1083(a)–(c), 7.1084(a)–(c), 7.1085(a)–(c), 7.1087, 7.1089; 56 Pa.B. 5898 et seq.
Research note
Keep existing directives to agencies distinct from completed PUC rulemaking or DEP regulation. The order creates no private right of action; § 7.1087 limits implementation to existing legal authority.
Scope, status, and limitations
Applicability
Applies to Governor-controlled agencies and specified applications. The GRID consent-agreement/review pathway applies to projects with peak demand over 25 MW that commit to GRID requirements. Local governments and independent agencies are not directly controlled by this order.
Exceptions / limits
The order controls agencies under the Governor, not local governments or independent agencies. Some provisions direct advocacy for future PUC rules or DEP recommendations rather than establish final utility tariffs or new environmental standards. It creates no private right and is limited by existing law.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Executive Order 2026-05: responsible data-center development (56 Pa.B. 5898 et seq.; 4 Pa. Code §§ 7.1082(a)–(e), 7.1083(a)–(c), 7.1084(a)–(c), 7.1085(a)–(c), 7.1087, 7.1089) ↗
Read controlling official text ↗
South Dakota · State · StatuteSource-verified

SB 135: large-load customer terms and data-center water reporting

For data centers with peak demand of at least 10 MW, providers must use separate service terms and recover fairly attributable costs including departure or material load reduction. Operators notify local water providers before operation, obtain written compatibility determinations, comply with Board allocation limits prioritizing residential and essential services, and submit public semiannual water reports.

2026 S.D. SB 135 · Enacted; effective in 2026 · checked 2026-10-28

Adopted2026-03-24Effective2026-07-01
PowerPublic financeWaterParticipationLand use
Power · Public finance — provision

For a data center with peak demand of at least 10 MW, an electricity provider must maintain separate service terms requiring the customer to reimburse all costs fairly attributed to its demand and consumption, including costs incurred if the data center departs the system or materially reduces load.

Covered entities
Electric providers and covered data-center customers meeting statutory load criteria.
Threshold / exception
Peak demand of 10 MW or greater.
Existing facilities
Specific customer/service timing provisions apply; review current provider terms.
Enforcement
South Dakota Public Utilities Commission or relevant public-power provider, depending on provider type.; Separate service terms and cost-reimbursement mechanisms.
Pinpoint
2026 S.D. SB 135, enrolled §§ 2–4 (new Title 49 provisions)
Research note
The act preserves the authority of counties, municipalities, and other political subdivisions to limit, prohibit, or otherwise regulate data center construction, development, or operation.
Water · Participation · Land use — provision

Before operations commence, the operator notifies each local water provider in the proposed area of projected consumption. Each provider issues a written compatibility determination; the operator submits notices/determinations to the Board. The Board may set consumption limits after allocating water to residential and essential public services. Operators submit semiannual water-use reports, including average use and compliance certification, and the Board makes usage data public.

Covered entities
Covered water providers, data centers, and South Dakota Board of Water Management.
Threshold / exception
Data center as defined by act: peak demand of 10 MW or greater.
Existing facilities
Reporting schedule includes periodic public reporting; exact facility transition terms require act-level review.
Enforcement
Water provider and Board of Water Management; Written compatibility determination and public/semiannual reporting.
Pinpoint
2026 S.D. SB 135, enrolled §§ 5–6 (new Title 49 provisions)
Research note
Board compliance statement does not authorize consumption above a later Board-set allocation limit. Rulemaking/orders remain implementation matters.
Scope, status, and limitations
Applicability
Large-load customer and data-center water provisions under SB 135; specific requirements apply to covered providers, customers, and water authorities.
Exceptions / limits
The enrolled act text sets the core duties. Implementation details are prescribed by the Board of Water Management and electricity providers; the water allocation limit is separately set by Board order after residential and essential public-service allocation.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
SB 135: large-load customer terms and data-center water reporting (2026 S.D. SB 135, enrolled §§ 2–6) ↗
Read controlling official text ↗
Nevada · State · Executive orderSource-verified

Executive Order 2026-005: data-center tax abatements and community commitments

Requires specified state tax-abatement applicants to make a community-support commitment as part of the application process.

Nevada Executive Order 2026-005 · Effective · checked 2026-10-28

Adopted2026-09-17Effective2026-09-17
WaterPowerAir qualityPublic financeParticipationLand use
Water · Power · Air quality · Public finance · Participation · Land use — provision

For covered pending sales/use-tax abatement applications, the applicant must satisfy the order’s Community Support Commitment addressing specified community, water, ratepayer, reliability, workforce, siting, and transparency topics; noncompliance can lead to suspension or recapture within statutory limits.

Covered entities
Applicants for specified Nevada state sales/use tax partial abatements whose applications had not been acted upon by the Economic Development Board at the order’s cutoff.
Threshold / exception
Program eligibility and the order’s scope are tied to pending state tax-abatement applications; the order specifies a 4.6% tax floor.
Existing facilities
Does not reopen abatements already approved by the Board.
Enforcement
Nevada Economic Development Board and administering state agencies.; Commitment requirements and statutory suspension/recapture mechanisms.
Pinpoint
EO 2026-005, §§ 1–8
Research note
This is an incentive-eligibility condition, not a generally applicable operating permit, PUC tariff, or local zoning rule.
Scope, status, and limitations
Applicability
Only pending applications for state sales/use-tax partial abatements not yet acted upon by the Economic Development Board, as specified in the order.
Exceptions / limits
Does not change approved abatements, utility tariffs, PUC authority, or local land-use law; conditions are limited to the tax-abatement program and statutory recapture limits.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
Executive Order 2026-005: data-center tax abatements and community commitments (Executive Order 2026-005, §§ 1–8; signed September 17, 2026) ↗
Read controlling official text ↗
Oklahoma · State / electric supplier regulators · StatuteSource-verified

Oklahoma Data Center Customer Ratepayer Protection Act of 2026

For qualifying new data-center and other computing loads of at least 75 MW, Oklahoma requires supplier-specific service terms and cost protections intended to keep directly caused costs and stranded investment from shifting to other customers. Some land purchases outside industrial parks or municipalities also trigger notice to regulators, county commissioners, and abutting owners.

2026 Okla. H.B. 2992; new 17 O.S. §§ 900–906 · Effective; enrolled act states July 1, 2026 and separately contains an emergency clause; confirm codified effective treatment · checked 2026-10-28

Adopted2026-05-11Effective2026-07-01 (express date in § 8; § 9 emergency clause creates a timing issue to confirm)
PowerPublic financeLand useParticipationcommunity
Power · Public finance — provision

Reviewing governing bodies must protect residential, commercial, and industrial customers from unjust rates directly resulting from large-load service and allocate costs and revenues consistent with cost causation. Every electric supplier must maintain separate large-load terms and tariffs, including credit or other measures to recover fairly allocated direct-service costs that may be stranded if load departs or materially falls. Service term must be at least ten years, subject to the stated tax-exempt municipal-financing exception.

Covered entities
New data centers, cryptocurrency mining operations, and primary AI-computing facilities contracting for at least 75 MW per facility or in aggregate behind one interconnection after July 1, 2026; electric suppliers and rate-reviewing governing bodies.
Threshold / exception
75 MW or greater, per facility or aggregated behind a single point of interconnection; new qualifying loads after July 1, 2026.
Existing facilities
The statutory definition is framed around new loads after July 1, 2026; application to existing service/load is not assumed.
Enforcement
Applicable rate-review governing body; Oklahoma Corporation Commission has exclusive enforcement jurisdiction over suppliers subject to its electric-rate jurisdiction.; Separate tariffs and service terms; credit and cost-recovery protections; OCC rules/enforcement within its jurisdiction; service compliance obligations for other suppliers.
Pinpoint
2026 Okla. H.B. 2992, §§ 2–6 (new 17 O.S. §§ 901–905), pp. 2–4
Research note
The act establishes a framework, not a specific rate or approved tariff. Track utility-specific implementation and clarify how the § 8 date interacts with the emergency clause.
Land use · Participation · community — provision

A covered large-load customer or its developer/owner/agent that purchases land outside an industrial development park or municipality must notify the Corporation Commission, county commissioners, and owners of abutting properties within 60 days by certified mail. Failure carries a $1,500-per-day-per-violation administrative penalty enforced by the county commissioners.

Covered entities
Covered large-load customers and their developers, owners, or representatives purchasing qualifying land in Oklahoma.
Threshold / exception
The purchaser must meet the act’s large-load definition (75 MW or more); property must be outside an industrial development park or municipality.
Existing facilities
Triggered by land purchase for the covered large load; no retroactive notice rule identified in the enrolled text.
Enforcement
Oklahoma Corporation Commission and relevant county commissioners; county commissioners collect and enforce the stated penalty.; Certified-mail notice within 60 days; administrative penalty of $1,500 per day per violation.
Pinpoint
2026 Okla. H.B. 2992, § 7 (new 17 O.S. § 906), pp. 4–5
Research note
This is post-purchase notice, not a zoning hearing, public-comment right, permit prerequisite, or general statewide notice for every proposed project.
Scope, status, and limitations
Applicability
The large-load definition includes new data centers, cryptocurrency mining, and facilities primarily providing AI computing, at 75 MW or more per facility or in aggregate behind one interconnection after July 1, 2026. Rules apply across investor-owned, cooperative, municipal, and public-power suppliers. The adjacent-land notice applies to covered purchasers acquiring land outside an industrial development park or municipality.
Exceptions / limits
No actual tariff or OCC implementing rule was reviewed. Enrolled § 8 says July 1, 2026, while § 9 declares an emergency and says the act takes effect after passage and approval; exact effective-date treatment should be reconciled to codification. A 10-year service term has a stated exception for certain tax-exempt-financed public-power agreements.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
HB 2992, enrolled final version (2026 Okla. H.B. 2992, §§ 2–9, pp. 2–5) ↗HB 2992 bill history and version record (History; Versions (Enrolled final version, May 5, 2026)) ↗
Read controlling official text ↗
Oklahoma · State · StatuteSource-verified

Oklahoma groundwater-use amendments (SB 259)

Starting November 1, 2026, a data center seeking groundwater permits may not use groundwater-consuming evaporative or discharge cooling without recirculation; the permit applicant must show a closed-loop, dielectric-immersion, or comparably low-consumptive design as determined by the state water board.

2026 Okla. S.B. 259; 82 O.S. §§ 1020.12, 1020.15, 1020.19B · Enacted; effective November 1, 2026 · checked 2026-10-28

Adopted2026-05-20Effective2026-11-01
Water
Water — provision

The Water Resources Board may not permit groundwater use for cooling a data-processing facility or data center through open-air evaporative systems or another cooling technology that consumes groundwater through evaporation or discharge without recirculation. A permit may issue only if the applicant demonstrates closed-loop, dielectric-immersion, or another comparably low-consumptive technology that substantially recirculates groundwater and minimizes consumptive loss as the Board determines.

Covered entities
Applicants and users seeking Oklahoma groundwater permits for cooling a data-processing facility or data center.
Threshold / exception
No data-center size threshold is stated in this paragraph; groundwater permit requirement and covered cooling use control.
Existing facilities
Effective November 1, 2026; transition or grandfathering for existing permits requires review of implementation and other applicable permit provisions.
Enforcement
Oklahoma Water Resources Board.; Groundwater permit denial/conditions; complaint investigation; cease-and-desist, fines, penalties, more frequent reporting, injunction, permit suspension, and other administrative remedies under the amended provisions.
Pinpoint
2026 Okla. S.B. 259, § 2 (amending 82 O.S. § 1020.15(A)(11), (B)), pp. 2–4; § 4, p. 6
Research note
This rule is specific to groundwater permitting and the statutory consumptive-loss formulation. Do not describe it as a statewide ban on cooling towers or as a restriction on municipal/reclaimed water.
Scope, status, and limitations
Applicability
This is a groundwater-use restriction tied to groundwater permits and applies to data-center cooling systems within the statutory text. It is not a ban on all data-center cooling or all water use.
Exceptions / limits
Rules and board implementation were not reviewed. The act also changes generally applicable permitted-groundwater reporting, waste investigation, and enforcement; this dataset captures only the explicit data-center cooling rule.
Litigation
Unknown; litigation review is not a finding that no challenge exists.
Sources
SB 259, enrolled final version (2026 Okla. S.B. 259, §§ 1–4, pp. 1–6) ↗
Read controlling official text ↗
New Jersey · State · StatuteSource-verified

Data Center Fair Share Act: BPU electric-service standards and tariffs

New Jersey law directs the BPU to set large-data-center electric-service standards and requires utilities to create approved tariffs. The framework assigns attributable grid costs to covered customers, includes long-term financial protections, and requires demand-flexibility commitments. The exact threshold and tariffs depend on BPU and utility proceedings.

P.L. 2026, c.32; N.J.S.A. 48:7-6.2 (A796/S731) · Enacted and effective; BPU standards and utility tariffs pending implementation · checked 2026-10-28

Adopted2026-07-07Effective2026-07-07
PowerPublic financeclimateparticipation
Power · Public finance · climate · participation — provision

By July 7, 2027, the BPU must establish standards by order for each electric public utility, with stakeholder input. The utility-specific definition of a large data center must use a minimum MW threshold no greater than 50 MW and aggregate related facilities sharing ownership/control, location, or substantial infrastructure. Standards must address full attribution of generation, transmission, distribution, and substation costs; stranded-cost protection; efficiency and new clean generation/storage incentives; co-located-generation treatment; demand-reduction trade programs; interconnection priority for binding clean-resource or demand-reduction commitments; priority curtailment of covered data-center loads before residential load during system emergencies (excluding designated critical load); and screening against duplicate or speculative interconnection requests.

Covered entities
New Jersey electric public utilities and their customers that meet the BPU-defined large data center/customer criteria; utility tariffs and specific threshold definitions are implementation-dependent.
Threshold / exception
BPU must choose a minimum MW threshold for each electric public utility that is not greater than 50 MW; related facilities must be aggregated under the statutory ownership, site, or shared-infrastructure criteria.
Existing facilities
Large data centers approved for utility service before July 7, 2026 are exempt from selected subsection d requirements for approved service only; the BPU may phase in specified cost allocation. New or expanded service above the BPU threshold is not covered by that exemption. Applications pending when an approved tariff takes effect are generally covered upon service commencement unless BPU finds application inequitable.
Enforcement
New Jersey Board of Public Utilities; electric public utilities implement BPU-approved standards and tariffs.; BPU standards by order; utility rate-class/tariff petitions within 180 days after the order; approved tariff conditions, cost-allocation rules, demand-flexibility commitments, curtailment, and screening requirements.
Pinpoint
N.J.S.A. 48:7-6.2(1)(b)(1)–(13), (1)(c), (1)(f)–(j); P.L. 2026, c.32
Research note
These are statutory design instructions for standards and tariffs; some precise obligations do not attach until BPU orders and approved utility tariffs. BPU published an implementation RFI on October 19, 2026, and scheduled a public stakeholder meeting for November 4 with written responses due November 13, 2026 at 5 p.m. The RFI is not itself a final order or tariff.
Power · Public finance · participation — provision

BPU-approved terms must require adequate guarantees that covered customers pay for at least 85 percent of requested electricity supply for ten years (or as otherwise set in BPU standards), plus deposits, security, or qualifying financial commitments against lower-than-expected use or closure. Tariffs must require demand-flexibility commitments using at least one statutory pathway, annual actual-performance reporting to BPU, and payment of reasonable utility interconnection and study costs by new customers. A stranded-cost mechanism may recover amounts not otherwise secured from the large-data-center customer class.

Covered entities
Large data center customers of New Jersey electric public utilities under BPU standards and approved tariffs; existing approved-service customers have the limited exception described in subsection g.
Threshold / exception
Applies through the utility-specific BPU definition, which must use an MW threshold no greater than 50 MW and aggregate related facilities. The 85% guarantee concerns requested electricity supply, not a universal 85% total-bill minimum.
Existing facilities
New large data-center service is subject to the financial-guarantee, security, and interconnection-study conditions in approved tariffs. Specified pre-July 7, 2026 approved service is exempt from selected provisions; later added load is not exempt under the statutory text.
Enforcement
New Jersey Board of Public Utilities and electric public utilities through approved tariffs.; Financial guarantees, deposits/security, customer-class stranded-cost recovery, tariffed demand-flexibility requirements and financial penalties for nonperformance, annual actual-flexibility reporting, and recovery of reasonable interconnection/study costs.
Pinpoint
N.J.S.A. 48:7-6.2(1)(d)(1)–(10), (1)(g), (1)(i); P.L. 2026, c.32
Research note
The 85% figure applies to electricity supply requested and is subject to BPU standards. Do not say it requires customers to pay 85% of all service charges. The current BPU RFI asks how minimum payment, ramping, penalties, verification, and creditworthiness should work; final tariff details remain undecided.
Scope, status, and limitations
Applicability
Applies to large data center customers served by electric public utilities in New Jersey. BPU must define qualifying characteristics and a minimum MW threshold for each utility; that threshold cannot exceed 50 MW and must aggregate peak monthly energy demand for facilities under common ownership/control, on the same or contiguous sites, or sharing substantial infrastructure. Utilities file tariffs within 180 days after BPU standards orders; tariffs apply after BPU approval. Pending service applications and already approved pre-effective-date service have specified transition/grandfathering treatment.
Exceptions / limits
The statute is operative, but BPU standards and utility tariffs determine the specific thresholds and customer terms. Do not describe all statutory design criteria as immediately operative tariff conditions before implementation. The RFI docket is at an early stakeholder-input stage as of the research cutoff. Pre-effective-date approved service is exempt from selected requirements for approved MW only; expansions above the eventual threshold remain subject to tariff. Federal wholesale and transmission jurisdiction is expressly preserved.
Litigation
Not researched in this batch; litigation review is not a finding that no challenge exists.
Sources
P.L. 2026, c.32 — Data Center Fair Share Act (chaptered text) (P.L. 2026, c.32; N.J.S.A. 48:7-6.2, §§ 1(b)–(j), 2) ↗BPU Data Center Fair Share Act implementation RFI — Docket EO26080463 (Docket EO26080463, Notice and Request for Information, Oct. 19, 2026, pp. 1–3) ↗
Read controlling official text ↗

State research coverage

Use the table to see the distinction between source-verified legal instruments, records needing review, and source leads. Zero records does not mean no law applies.

StateVerified instrumentsNeeds reviewOfficial source leads
Alabama000
Alaska000
Arizona001
Arkansas000
California610
Colorado000
Connecticut000
Delaware000
Florida100
Georgia000
Hawaii000
Idaho000
Illinois006
Indiana000
Iowa000
Kansas000
Kentucky000
Louisiana000
Maine000
Maryland000
Massachusetts000
Michigan000
Minnesota501
Mississippi000
Missouri000
Montana000
Nebraska010
Nevada100
New Hampshire000
New Jersey112
New Mexico000
New York000
North Carolina000
North Dakota000
Ohio102
Oklahoma200
Oregon101
Pennsylvania200
Rhode Island000
South Carolina000
South Dakota100
Tennessee000
Texas000
Utah100
Vermont000
Virginia312
Washington000
West Virginia000
Wisconsin000
Wyoming000

Source notebook

53 source records · 0 selected to compare

Official source records include controlling texts and summary-only leads. Each record states its current verification level and next research step.

Fairfax County · LocalSource-verified legal instrument

Data center zoning: noise, design, and proximity

The adopted county amendment requires noise studies at approval and pre-occupancy stages, screening of operating equipment, and residential setbacks, with approval exceptions and transition provisions.

NoiseLand useParticipation
Source & research details
Publisher
Fairfax County Government
Source location
ZO 112.1-2024-9 / 112.2-2024-8, § 4102.6.A; Appendix 1, § 2.B
Legal verification
Effective; local zoning scope
Last read
2026-10-28
Next research step
Review Chapter 108.1 noise limits separately and check later amendments on refresh.
Loudoun County · LocalOfficial summary checked; controlling text pending

Noise studies and neighborhood concerns

County’s official page reports data-center noise studies and a residential property-line limit. This remains an agency summary, not a substitute for the ordinance text. A separate ordinance record is linked with current-codification caveats.

NoiseAir quality
Source & research details
Publisher
Loudoun County
Source location
Data Centers: Noise & Air Quality Concerns; noise subsection
Legal verification
Not represented as a verified instrument
Last read
2026-10-28
Next research step
Use the linked ordinance record’s follow-up to retrieve current clean codification and confirm amendment history; do not treat this summary as the controlling standard.
Ohio Power Company service area · UtilityOfficial utility summary checked; current text/status pending

Ohio Power Company data-center tariff

Ohio Power Company reports PUCO adopted the 2024 Data Center Tariff settlement in July 2025 and its compliance tariff took effect July 23, 2025. Exact current tariff obligations and appellate status remain under review.

PowerPublic finance
Source & research details
Publisher
Ohio Power Company / AEP Ohio
Source location
Data Center Tariff; tariff effective date and study process
Legal verification
Not represented as a verified instrument
Last read
2026-10-28
Next research step
Retrieve approved Schedule DCT and order text; verify tariff conditions and current court docket. Scope is Ohio Power's service territory, not the State of Ohio.
Minnesota · StateOfficial summary checked

Environmental review and pollution permits

MPCA describes its environmental-review role and air, water, and stormwater permitting. It identifies cooling-water and wastewater discharges, generators, and fuel storage as relevant permitting subjects.

WaterAir qualityParticipation
Source & research details
Publisher
Minnesota Pollution Control Agency
Source location
The MPCA’s role; Environmental review; Permitting
Legal verification
Project-specific applicability not yet verified
Last read
2026-10-28
Next research step
Identify controlling statutes and rules, permit triggers, and the appropriate water-supply authority.
United States · FederalOfficial summary checked

Air standards and permitting for power equipment

EPA identifies emissions standards for stationary engines and turbines and explains that state and local air agencies issue most data center air permits under approved programs. EPA also clarifies how specified 2026 emergency orders are treated for cited engine rules.

Air quality
Source & research details
Publisher
U.S. Environmental Protection Agency
Source location
Clean Air Act Resources for Data Centers; Spring and Summer 2026 DOE 202(c) Emergency Orders
Legal verification
Equipment-specific applicability not yet verified
Last read
2026-10-28
Next research step
Verify equipment type, source classification, construction date, permit conditions, and the relevant engine/turbine subpart.
Fairfax County · LocalOfficial adopted legal text

Adopted Fairfax County data-center zoning amendment text

Controlling amendment text including § 4102.6.A standards, noise-study submission requirements, and transition provisions.

NoiseLand use
Source & research details
Publisher
Fairfax County Board of Supervisors
Source location
pp. 0–4; §§ 4102.6.A(1), (4), (6), 8101.2.E(12), 8101.3.D(8), Appendix 1 § 2.B
Legal verification
Effective per county amendment history
Last read
2026-10-28
Next research step
Check Chapter 108.1 noise code.
Fairfax County · LocalOfficial amendment history checked

Fairfax County adopted amendment history

Official history confirms the data-center amendment's adoption and effective dates and lists later adopted zoning amendments.

NoiseLand use
Source & research details
Publisher
Fairfax County Department of Planning and Development
Source location
112.1-2024-9 and 112.2-2024-8 – Data Centers
Legal verification
Adopted 2024-09-10; effective 2024-09-11
Last read
2026-10-28
Next research step
Recheck this page during each update.
Commonwealth of Virginia · StateCurrent codified statute checked

Virginia Code § 15.2-2209.5

Current codified statute governing site assessments for new high-energy-use facilities in specified land-use proceedings.

NoiseWaterPowerParticipationLand use
Source & research details
Publisher
Virginia General Assembly / Legislative Information System
Source location
Subsections A–G
Legal verification
Codified as effective; effective date not independently verified
Last read
2026-10-28
Next research step
Read 2026 Acts chapters 567 and 568 for effective date and legislative history.
United States · FederalCurrent eCFR provision checked

40 C.F.R. § 63.6640

Current eCFR text on compliance demonstrations and emergency stationary RICE operating limits.

Air qualityPower
Source & research details
Publisher
Office of the Federal Register / EPA
Source location
§ 63.6640(a)–(f); particularly (f)(1)–(4)
Legal verification
Effective as displayed through 2026-10-26; applicability is equipment-specific
Last read
2026-10-28
Next research step
Check each engine's design, source status, and permit.
Minnesota · StateOfficial legal text checked

Minnesota Laws 2025, First Special Session, chapter 12

Data-center-specific water, very-large-customer, annual-fee, and sales-tax provisions; the chapter separately states the effective date for each section.

Source & research details
Publisher
Minnesota Office of the Revisor of Statutes
Source location
Sections 3–4, 9, 16–17; signed June 14, 2025
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Minnesota · StateOfficial legal text checked

Minn. Stat. § 103G.265, subd. 5

Preapplication evaluation for certain data-center water appropriation projects above the annual consumptive-use threshold; agency communications/data under this subdivision are nonpublic.

WaterParticipation
Source & research details
Publisher
Minnesota Office of the Revisor of Statutes
Source location
Subd. 5(a)–(g); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 3
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Minnesota · StateOfficial legal text checked

Minn. Stat. § 103G.271, subd. 5b

Water-conservation and watershed-health considerations for new or modified permits serving data centers above 100 million gallons per year.

WaterParticipation
Source & research details
Publisher
Minnesota Office of the Revisor of Statutes
Source location
Subd. 5b(a)–(b); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 4
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Minnesota · StateOfficial legal text checked

Minn. Stat. § 216B.1622

Requires PUC definition of a very-large-customer class by December 15, 2026 and lays out considerations for tariffs/service agreements, including cost assignment, clean-energy benchmarks, and stranded-cost protections.

PowerPublic finance
Source & research details
Publisher
Minnesota Office of the Revisor of Statutes
Source location
Subds. 1–3; 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 9
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Minnesota · StateOfficial legal text checked

Minn. Stat. § 216B.72

Annual fee for qualified large-scale data centers based on forecast peak demand arranged by the utility; fee data are nonpublic.

PowerPublic finance
Source & research details
Publisher
Minnesota Office of the Revisor of Statutes
Source location
Subds. (a)–(c); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 16
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Minnesota · StateOfficial legal text checked

Minn. Stat. § 297A.68, subd. 42

Sales/use tax exemption for qualifying data-center IT equipment and software; large-scale facilities have additional labor and green-building conditions, with recapture for failure to meet the green-building deadline.

Public financePower
Source & research details
Publisher
Minnesota Office of the Revisor of Statutes
Source location
Subd. 42(a), (e)–(n); 2025 Minn. Laws 1st Spec. Sess., ch. 12, § 17; ch. 13, art. 3, § 4
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Pennsylvania · StateOfficial legal text checked

61 P.S. § 2931-D

Sales/use tax exemption for equipment purchased for installation in a certified computer data center, subject to exclusions and time-limited owner/tenant qualification periods.

Public financePower
Source & research details
Publisher
Pennsylvania General Assembly
Source location
§ 2931-D(a)–(d); as amended by 2024 Act 56, § 30(12)
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
United States · FederalOfficial legal text checked

40 C.F.R. § 60.4211

Selected compliance provisions for stationary compression-ignition engines, including conditional emergency-engine hours and restrictions on non-emergency dispatch.

Air qualityPower
Source & research details
Publisher
Office of the Federal Register / U.S. EPA
Source location
§ 60.4211(a), (f)–(g), current eCFR displayed through 2026-10-26
Legal verification
Current official source reviewed
Last read
2026-10-28
Next research step
Recheck current codification and amendments on refresh.
Utah · StateOfficial enrolled law checked

HB 76 — Data Center Water Transparency Amendments (enrolled act)

Defines covered large data centers and requires preconstruction water-provider notice and projected-use reporting, annual withdrawal/conservation reporting, public disclosure with specified proprietary protections, and enforcement.

WaterLand useParticipation
Source & research details
Publisher
Utah Legislature
Source location
Utah Code § 73-5-8.3(1)–(6), enrolled HB 76 §§ 2–3, pp. 3–7
Legal verification
Effective May 6, 2026; covered new-facility duties have July 1, 2026 applicability terms
Last read
2026-10-28
Next research step
Check implementing rules and first public reports; research separate water-right and wastewater permit conditions.
Virginia · StateOfficial codified text checked

Va. Code § 10.1-1322.6 — data-center engine-generator emission limits

Air permits for covered data-center applications submitted on/after July 1, 2026 must set each engine-generator's emissions limit at or below Tier 4-equivalent emissions, with stricter standards preserved.

Air quality
Source & research details
Publisher
Virginia Legislative Information System
Source location
Subsections A–C; Tier 4 equivalent definition and permit application trigger
Legal verification
Effective July 1, 2026
Last read
2026-10-28
Next research step
Check current DEQ implementation rules and facility-specific permit conditions.
Virginia · StateOfficial legislative history checked

HB 507 (2026), official bill history and Chapter 397 effective date

Official bill history confirms enactment as Chapter 397 and July 1, 2026 effective date.

Air quality
Source & research details
Publisher
Virginia Legislative Information System
Source location
History: Approved by Governor Apr. 8, 2026; Chapter 397; effective July 1, 2026
Legal verification
Enacted
Last read
2026-10-28
Next research step
Use current codified text for the controlling rule.
Ohio Power Company service territory · UtilityOfficial approved tariff sheets checked

Ohio Power Company current tariff book — Schedule DCT

Current official tariff text sets applicability above 25 MW and separate minimum demand billing rules for existing and new data-center loads.

PowerParticipation
Source & research details
Publisher
Ohio Power Company / AEP Ohio
Source location
P.U.C.O. No. 22, Schedule DCT, sheets 223-2–223-5; issued/effective Aug. 28, 2026
Legal verification
Effective; Ohio Power territory only; challenged status requires docket refresh
Last read
2026-10-28
Next research step
Verify Ohio Supreme Court case 2025-1458 and current PUCO order status; do not generalize to statewide utility service.
Ohio Power Company service territory · State utility commissionOfficial agency summary checked; underlying order text not separately retrieved

PUCO Aug. 5, 2026 data-center Standard Service Offer safeguards

PUCO described 180-day customer notice, separate procurement/spot purchases, and assignment of related costs to the data-center customer; current tariff sheets cite the order.

PowerParticipation
Source & research details
Publisher
Public Utilities Commission of Ohio
Source location
Official Aug. 5, 2026 announcement; PUCO Case 26-113-EL-ATA
Legal verification
Order issued; appeal/stay status unresolved in this batch
Last read
2026-10-28
Next research step
Retrieve order text and check subsequent docket and court status.
Oregon · StateOfficial enrolled law checked

Oregon HB 3546 (2025), enrolled act

Creates separate utility classification/tariff principles and requires long-term contracts and minimum payments for covered large energy use facilities.

PowerParticipation
Source & research details
Publisher
Oregon Legislative Assembly
Source location
2025 Or. Laws ch. 323, §§ 2–9; enrolled HB 3546, pp. 1–3
Legal verification
Effective on passage, June 16, 2025
Last read
2026-10-28
Next research step
Check PUC implementation Order 26-154, tariff sheets, reconsideration order, and judicial review.
Oregon / Portland General Electric implementation proceeding · State utility commissionOfficial docket summary checked; underlying order not retrieved

Oregon PUC eDockets UM 2377 docket history

Official docket lists Schedule 96 adoption, later reconsideration, compliance filings, and a petition for judicial review. Order PDF was too large to retrieve in this batch.

PowerParticipation
Source & research details
Publisher
Oregon Public Utility Commission
Source location
Orders 26-154 (May 7), 26-239 (July 10), 26-309 (Aug. 31), compliance advice filing (Sept. 15), appeal filing (Sept. 10, 2026)
Legal verification
Implementation under procedural review; legal effect and final status require follow-up
Last read
2026-10-28
Next research step
Read orders, Schedule 96, and judicial review record before recording implementation terms.
Loudoun County · LocalOfficial County-hosted comparison text checked; current codification needs review

Loudoun County Zoning Ordinance Chapter 7 official comparison PDF

County-hosted comparison text specifies A-weighted limits, measurement procedures, exceptions, use-specific noise rules, and pre/post-construction study and mitigation standards.

NoiseLand useParticipation
Source & research details
Publisher
Loudoun County Government
Source location
§ 7.05.03(A)–(G), PDF pp. 56–57
Legal verification
Effective ordinance section represented from official comparison copy; amendment version caveat
Last read
2026-10-28
Next research step
Retrieve current clean ordinance and confirm all later amendments and data-center-specific Chapter 4 cross-reference.
Loudoun County · LocalOfficial source unavailable; not evidence that the rule is absent

Loudoun County Zoning Ordinance Chapter 4 current PDF endpoint

Official County source endpoint is retained for follow-up; clean current PDF could not be retrieved in this batch. Search-indexed official text indicates data-center noise-study and acoustical-barrier provisions, not separately validated against a retrieved current file.

NoiseLand use
Source & research details
Publisher
Loudoun County Government
Source location
§ 4.06.02 data-center use-specific standards; endpoint returned 404 on 2026-10-28
Legal verification
Unresolved current text
Last read
2026-10-28
Next research step
Retrieve from County ordinance interface or obtain a current official PDF through authorized County channel; verify against clean codification.
Loudoun County · LocalOfficial agency page checked

Loudoun County official zoning ordinance scope and exceptions

County page identifies the 2023 ordinance effective date and exceptions for incorporated towns, Route 28 Tax District 1972 zoning, and grandfathered applications.

Land use
Source & research details
Publisher
Loudoun County Government
Source location
Ordinance scope/exception notice; adopted and effective Dec. 13, 2023
Legal verification
Official explanatory page; zoning text controls
Last read
2026-10-28
Next research step
Consult official ordinance and amendment history for site-specific applicability.
California · StateOfficial bill/chapter status verified; chaptered act text reviewed

AB 1577, Data centers: energy and local-permit information

Requires the California Energy Commission to collect specified facility information and requires local permit applicants to disclose certain energy and sound information.

Participation
Source & research details
Publisher
California Legislature
Source location
Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.
Legal verification
Enacted chapter; text reviewed via accessible chaptered copy; official Legislature bill page linked
Last read
2026-10-28
Next research step
Confirm chaptered-text effective date, applicability details, subsequent amendments, and implementing agency action.
California · StateOfficial bill/chapter status verified; chaptered act text reviewed

AB 2383, Data centers: electric service tariffs

Directs electrical corporations to file transmission and distribution tariffs for participating data-center customers and establishes related requirements for community choice aggregators and energy service providers.

Power
Source & research details
Publisher
California Legislature
Source location
Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.
Legal verification
Enacted chapter; text reviewed via accessible chaptered copy; official Legislature bill page linked
Last read
2026-10-28
Next research step
Confirm chaptered-text effective date, applicability details, subsequent amendments, and implementing agency action.
California · StateOfficial bill/chapter status verified; chaptered act text reviewed

AB 2469, Data centers: water-supply assessment

For covered new data centers and expansions, bars a local government from approving a permit or entitlement increasing peak water use unless a water-supply assessment, projected-use/efficiency information, and workforce disclosure are provided; a water-scarcity plan is required beginning in 2028.

WaterLand use
Source & research details
Publisher
California Legislature
Source location
Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.
Legal verification
Enacted chapter; text reviewed via accessible chaptered copy; official Legislature bill page linked
Last read
2026-10-28
Next research step
Confirm chaptered-text effective date, applicability details, subsequent amendments, and implementing agency action.
California · StateOfficial bill/chapter status verified; chaptered act text reviewed

AB 2619, Data centers: water-use disclosure

Requires covered data centers to provide water-use information to water suppliers and local licensing authorities, including estimates at application and actual annual use at renewal, with cooling-system information.

WaterParticipation
Source & research details
Publisher
California Legislature
Source location
Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.
Legal verification
Enacted chapter; text reviewed via accessible chaptered copy; official Legislature bill page linked
Last read
2026-10-28
Next research step
Confirm chaptered-text effective date, applicability details, subsequent amendments, and implementing agency action.
California · StateOfficial bill/chapter status verified; chaptered act text reviewed

SB 886, Data centers: electrical service and cost allocation

Requires CPUC rules and tariffs addressing service for specified large data-center customers, including protections against shifting costs or stranded investments to other customers and customer-specific commitments.

PowerPublic financeParticipation
Source & research details
Publisher
California Legislature
Source location
Chaptered act and corresponding Government Code, Public Resources Code, Water Code, or Public Utilities Code provisions; see linked instrument pinpoint.
Legal verification
Enacted chapter; text reviewed via accessible chaptered copy; official Legislature bill page linked
Last read
2026-10-28
Next research step
Confirm chaptered-text effective date, applicability details, subsequent amendments, and implementing agency action.
California · StateChaptered text reviewed from accessible mirror; chapter status cross-checked on official California Legislature bill page

SB 887, Data centers: environmental review

Chapter 439 adds data-center CEQA definitions and entitlement coverage, bars categorical exemptions subject to listed exclusions, and adds a conditional Governor certification pathway with strict electricity, grid-cost, water, and community-benefit criteria.

Land useParticipation
Source & research details
Publisher
California Legislature
Source location
Cal. Pub. Res. Code §§ 21061.6, 21080.08, 21084(f), 21180(b)(5), 21183.6; 2026 Cal. Stats. ch. 439, §§ 2–6. Official bill page confirms chapter status; chaptered text read from mirror because official endpoint returned 403.
Legal verification
Enacted as 2026 Cal. Stats. ch. 439; full official chaptered text recheck queued
Last read
2026-10-28
Next research step
Recheck full enrolled/chaptered text on the official California source when accessible; track implementing uniform standards and project certifications.
California · StateSource-verified legal instrument; chapter text reviewed

SB 1168, Data centers: electrical service rate assessment

Directs the CPUC to assess rate opportunities intended to ensure large data-center customers bear a reasonable share of transmission/distribution and procurement costs and to alleviate residential cost pressure.

PowerPublic finance
Source & research details
Publisher
California Legislature
Source location
Cal. SB 1168, ch. 440, § 1
Legal verification
Official chaptered act text checked
Last read
2026-10-28
Next research step
Recheck implementing CPUC assessment and any resulting tariff proceedings.
Florida · StateSource-verified legal instrument

Large-scale data centers: water allocation safeguards and conservation plans

Limits water allocations for covered large-scale data centers where statutory resource-harm or land-use conditions apply; requires conservation plans and public hearings for specified high-volume applications.

WaterLand useParticipation
Source & research details
Publisher
Florida Senate / Florida Statutes
Source location
Fla. Stat. § 373.262(1)–(5); 2026 ch. 2026-65, § 5
Legal verification
Official legal text checked
Last read
2026-10-28
Next research step
Recheck amendments and implementation on the next refresh.
Pennsylvania · StateOfficial Pennsylvania Bulletin order checked

Executive Order 2026-05: responsible data-center development

Effective executive order requires public agency procedures for qualifying >25 MW projects, local/water-permit sequencing, no NDAs with covered agencies, a DEP project map and annual energy/water reporting beginning July 1, 2027. It directs special-counsel advocacy for future PUC curtailment and cost rules; DEP environmental rule review; and DCED local best practices.

PowerWaterLand useParticipationPublic finance
Source & research details
Publisher
Pennsylvania Bulletin / Governor
Source location
56 Pa.B. 5898 et seq.; 4 Pa. Code §§ 7.1082(a)–(e), 7.1083(a)–(c), 7.1084(a)–(c), 7.1085(a)–(c), 7.1087, 7.1089
Legal verification
Effective immediately under § 7.1089
Last read
2026-10-28
Next research step
Track implementing DEP procedures, PUC proceedings, reporting, and any amendment or rescission.
South Dakota · StateEnrolled act text verified

SB 135: large-load customer terms and data-center water reporting

Enrolled SB 135 defines a data center at 10 MW and addresses provider terms, cost attribution, local authority, water-provider compatibility, and public water-use reporting.

PowerWaterParticipationLand use
Source & research details
Publisher
South Dakota Legislature
Source location
2026 S.D. SB 135, enrolled §§ 2–6
Legal verification
Enacted; implementation details remain
Last read
2026-10-28
Next research step
Recheck amendments and implementation on the next refresh.
Nebraska · StateSource-verified legal instrument

LB 1010: Large Load Customer Regulation Act and data-center provisions

Slip law adds large-load customer provisions for public-power suppliers, including disclosures about competing interconnection requests and backup generation, study fees, site control, and cost commitments.

PowerPublic financeParticipation
Source & research details
Publisher
Nebraska Legislature
Source location
2026 Neb. LB 1010, enrolled/slip law; Neb. Rev. Stat. §§ 70-1506 et seq.
Legal verification
Official slip law checked; implementation effective dates require clause-level review
Last read
2026-10-28
Next research step
Verify operative dates by section and Public Power District implementation rules.
Nevada · StateSource-verified legal instrument

Executive Order 2026-005: data-center tax abatements and community commitments

Sets additional Community Support Commitment conditions for specified pending applications for state sales/use tax abatements, covering water, ratepayers, reliability, siting, workforce, community benefit, and transparency.

WaterPowerAir qualityPublic financeParticipationLand use
Source & research details
Publisher
Office of the Governor, State of Nevada
Source location
Executive Order 2026-005, §§ 1–8; signed September 17, 2026
Legal verification
Official legal text checked
Last read
2026-10-28
Next research step
Recheck amendments and implementation on the next refresh.
Oklahoma · StateSource-verified controlling text

HB 2992, enrolled final version

Enrolled text of the Data Center Customer Ratepayer Protection Act of 2026.

PowerPublic financeParticipationLand use
Source & research details
Publisher
Oklahoma Legislature
Source location
2026 Okla. H.B. 2992, §§ 2–9, pp. 2–5
Legal verification
Enacted; approved 2026-05-11; effective-date clauses require careful reading
Last read
2026-10-28
Next research step
Confirm codification and reconcile § 8 July 1 effective date with § 9 emergency clause against official session law/codification.
Oklahoma · StateOfficial status/history

HB 2992 bill history and version record

Official bill history records gubernatorial approval May 11, 2026 and identifies the enrolled final version.

PowerPublic financeParticipationLand use
Source & research details
Publisher
Oklahoma Legislature
Source location
History; Versions (Enrolled final version, May 5, 2026)
Legal verification
Approved by Governor 2026-05-11
Last read
2026-10-28
Next research step
On refresh, compare enrolled text to codified 17 O.S. §§ 900–906 and any OCC rules.
Oklahoma · StateSource-verified controlling text

SB 259, enrolled final version

Enrolled act amending groundwater waste and reporting laws, including restrictions on certain data-center cooling uses of groundwater.

WaterParticipation
Source & research details
Publisher
Oklahoma Legislature
Source location
2026 Okla. S.B. 259, §§ 1–4, pp. 1–6
Legal verification
Enacted; approved 2026-05-20; effective 2026-11-01
Last read
2026-10-28
Next research step
Check Oklahoma Water Resources Board rules and confirm codified 82 O.S. §§ 1020.15 and 1020.19B after effective date.
New Jersey · StateOfficial enactment/status confirmation; not operative-text verification

S3379/A4096 enactment and signing announcement

Governor confirms enactment of P.L. 2026, c.75 and describes the reporting program.

WaterPowerParticipation
Source & research details
Publisher
Office of the Governor of New Jersey
Source location
Governor announcement, Aug. 27, 2026
Legal verification
Signed 2026-08-27; P.L. 2026, c.75
Last read
2026-10-28
Next research step
Retrieve final chapter-law pamphlet and compare against enrolled/2R text before next substantive refresh.
New Jersey · StateOfficial bill reprint; chapter-text comparison outstanding

S3379, Second Reprint text

Official legislative text for the final reported bill, used with the Governor’s signing confirmation to identify reporting duties and exceptions.

WaterPowerParticipation
Source & research details
Publisher
New Jersey Legislature
Source location
P.L. 2026, c.75 (S3379/A4096), §§ 1(b)–(g), 2; compare chapter pamphlet on refresh
Legal verification
Final reprint text; enacted as P.L. 2026, c.75 but chapter pamphlet not retrieved
Last read
2026-10-28
Next research step
Obtain official chapter-law text and confirm the enacted version word-for-word.
Arizona · State legislatureOfficial proposal text; not an effective legal requirement

HB 2467 (2026), data-center incentives and requirements — proposal lead

The introduced proposal would have imposed renewable-energy-plus-storage and a water-intensity limit on data centers, and repealed existing incentive provisions. The official 2026 session-law index does not list HB 2467 among enacted chapters; treat this only as a proposal lead, not current law.

PowerWaterPublic finance
Source & research details
Publisher
Arizona Legislature
Source location
HB 2467, 57th Legislature, 2nd Regular Session (2026), proposed §§ 44-1799.101–.102; session-law index checked 2026-10-28
Legal verification
Proposed bill; no enacted chapter identified in the 2026 session-law index
Last read
2026-10-28
Next research step
Retrieve official bill-history record/committee action and preserve as a historical proposal; do not map its proposed standards as operative.
Illinois · State legislatureOfficial bill status/synopsis; proposed, not law

SB 3761 (2026), large-load tariff and disclosure proposal

The introduced proposal addresses a data-center self-direct tariff program, preconstruction disclosure to the Illinois Commerce Commission, annual water-use disclosure to DNR beginning in 2027, public aggregation, penalties, and utility tariff review. Official bill status lists a May 22, 2026 re-referral to Assignments; these are proposed provisions.

PowerWaterParticipationPublic finance
Source & research details
Publisher
Illinois General Assembly
Source location
SB 3761, 104th General Assembly, Synopsis As Introduced; Actions through May 22, 2026
Legal verification
Proposed; last displayed action May 22, 2026, re-referred to Assignments
Last read
2026-10-28
Next research step
Check current session action, amendments, committee disposition, and any successor bill before citing any proposal terms.
Illinois · State legislatureOfficial bill status/synopsis; proposed, not law

SB 4004 (2026), Mahomet Aquifer data-center protection proposal

The introduced bill would prohibit data centers from using Mahomet Aquifer water, restrict state permits for such withdrawals, require existing facilities to transition by 2028, and limit local NDAs that conceal data-center water use. Official bill status lists a May 22, 2026 re-referral to Assignments; proposal only.

WaterParticipation
Source & research details
Publisher
Illinois General Assembly
Source location
SB 4004, 104th General Assembly, Synopsis As Introduced; Actions through May 22, 2026
Legal verification
Proposed; last displayed action May 22, 2026, re-referred to Assignments
Last read
2026-10-28
Next research step
Check current session action and amendments; separately research operative groundwater and public-water rules.
Illinois · State legislatureOfficial bill status/synopsis; proposed, not law

SB 3120 (2026), water-stewardship eligibility proposal

The introduced bill would condition qualifying data-center status for an economic-development program on providing water-stewardship strategy details and require the state’s annual data-center investment report to include those strategies. Official bill status lists a May 22, 2026 re-referral to Assignments; proposal only.

WaterPublic financeParticipation
Source & research details
Publisher
Illinois General Assembly
Source location
SB 3120, 104th General Assembly, Synopsis As Introduced; Actions through May 22, 2026
Legal verification
Proposed; last displayed action May 22, 2026, re-referred to Assignments
Last read
2026-10-28
Next research step
Check current session action and amendments; review existing qualifying-data-center incentive law separately.
Illinois · State legislatureOfficial bill status/synopsis; proposed, not law

SB 2181 (2026), energy and water reporting proposal

The introduced bill would require annual energy and water consumption reports to the Illinois Power Agency and a study of data centers’ effects on ratepayers. Official bill status lists a May 22, 2026 re-referral to Assignments; proposal only.

PowerWaterParticipationPublic finance
Source & research details
Publisher
Illinois General Assembly
Source location
SB 2181, 104th General Assembly, Synopsis As Introduced; Actions through May 22, 2026
Legal verification
Proposed; last displayed action May 22, 2026, re-referred to Assignments
Last read
2026-10-28
Next research step
Check current session action and amendments; distinguish any enacted successor from this introduced text.
Illinois · State legislatureOfficial introduced bill text; proposed, not law

SB 4016 (2026), hyperscale data-center framework proposal

The introduced proposal would establish a broad hyperscale data-center framework covering water-impact permits, reporting, cumulative impacts, energy, community process, and financial programs. The enrolled dataset does not treat this introduced text as binding law.

WaterPowerAir qualityLand useParticipationPublic financeLifecycle
Source & research details
Publisher
Illinois General Assembly
Source location
SB 4016, 104th General Assembly, introduced version, Feb. 6, 2026
Legal verification
Proposed bill; introduced version only
Last read
2026-10-28
Next research step
Retrieve current official bill status and amendments; identify any provisions advanced in a successor vehicle.
Illinois · State legislatureOfficial bill status/synopsis; proposed, not law

HB 4989 (2026), data-center heat-reuse and cooling proposal

The introduced proposal would require data centers to adopt a heat-reuse plan and require liquid cooling for new centers with aggregate demand of at least 20 MW. Official bill status lists referral to the Rules Committee on February 6, 2026; proposal only.

WaterAir qualityPowerParticipation
Source & research details
Publisher
Illinois General Assembly
Source location
HB 4989, 104th General Assembly, Synopsis As Introduced; Actions through Feb. 6, 2026
Legal verification
Proposed; last displayed action Feb. 6, 2026, referred to Rules Committee
Last read
2026-10-28
Next research step
Check current session action and amendments; do not present proposed cooling technology requirements as binding.
New Jersey · StateOfficial chapter law text checked

P.L. 2026, c.32 — Data Center Fair Share Act (chaptered text)

Official chapter law codified at N.J.S.A. 48:7-6.2. Directs BPU standards and electric-utility tariff filings for large data-center customers, with cost, stranded-investment, financial-security, demand-flexibility, clean-resource, and curtailment provisions.

PowerPublic finance
Source & research details
Publisher
New Jersey Legislature
Source location
P.L. 2026, c.32; N.J.S.A. 48:7-6.2, §§ 1(b)–(j), 2
Legal verification
Signed and effective 2026-07-07; standards and tariffs pending
Last read
2026-10-28
Next research step
Read subsequent BPU docket filings and final standards/tariffs as they issue.
New Jersey · State utility commissionOfficial implementation request for information; not a final order or tariff

BPU Data Center Fair Share Act implementation RFI — Docket EO26080463

BPU staff requests public input on implementation standards and utility tariffs. Notice schedules a public stakeholder meeting for November 4, 2026 and written responses by November 13, 2026 at 5 p.m.; it is not a final order or tariff.

PowerPublic finance
Source & research details
Publisher
New Jersey Board of Public Utilities
Source location
Docket EO26080463, Notice and Request for Information, Oct. 19, 2026, pp. 1–3
Legal verification
Implementation proceeding; written response deadline 2026-11-13 17:00 Eastern
Last read
2026-10-28
Next research step
Review public comments after the deadline and track BPU standards order and utility tariff petitions.

Built for scrutiny.

Download methodology ↓

Evidence before labels

We distinguish discovery leads, official summaries, and verified legal instruments. A proposal is not an effective rule; a court challenge is not necessarily a stay.

Place matters

Local ordinances, utility service areas, and permit conditions have different reach. State shading is a navigation aid, not a statement of statewide applicability.

Show what is missing

Coverage expands in reviewed batches. Unresearched jurisdictions remain visible, and every future legal record will carry citations, applicability, exceptions, and a verification date.

Research scope, boundaries, and next steps

The current edition establishes eight pillars and a national navigation map, with 27 source-verified instruments, 4 needs-review records, and 38 linked provisions. The notebook also contains official source leads. One Loudoun record needs current-codification confirmation; independent review and broader state/local/utility coverage are still needed.

The map reuses the site's existing generalized U.S. state boundary dataset. It does not show facility locations, utility boundaries, pollution levels, or the strength of regulation. Federal, tribal, regional, and territorial coverage will require dedicated research; this state map covers the 50 states and D.C.

The educational guide describes potential concerns and policy options. Authority to adopt an option depends on the jurisdiction. We do not score jurisdictions or infer effectiveness from the existence of a rule.